:7 <br />Geo -Logic <br />AssocIATEs <br />CQA DAILY SUMMARY REPORT #026 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 026 Report Date: Friday June 21, 2013 <br />Weather: AM: 65 OF Clear <br />Guinn Construction Activities: <br />Onsite: 06:00 - 17:30 Hrs <br />PM: 91°F Clear <br />• The Contractor continued moisture conditioning and work with the smooth drum roller on the west and north <br />3:1 slope. <br />• The Contractor performed subgrade preparation work along the FU -10 tie-in; us laborers with rakes and <br />shovels. <br />• The Contractor performed grading work in clay borrow and adjacent areas to the east of FU -13. <br />• The Contractor continued moisture conditioning of haul roads and adjacent areas for dust control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators. <br />Equipment: (1) 140H Cat Motor -Grader, (3) Water trucks, (1) Cat Excavator, (3) D6 Cat Dozers, (5) 637 Cat <br />Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would be working on slope subgrade; would perform grading work in clay borrow area. <br />• Site Visitors: <br />None. <br />PAGE 1 OF 2 <br />