Final Construction Quality Assurance Report - WMU FU -13 <br />Forward Landfill <br />• Field Panel Identification: Prior to geomembrane deployment, GLA's CCW Monitor and <br />Comanco discussed and agreed to the identification code for each panel deployed. During the <br />deployment, GLA's CCW Monitor observed that the installer marked the panels deployed and <br />that each panel placed was marked with the manufacturer's roll number. <br />Field Panel Placement: During the panel placement, GLA's CCW Monitor recorded information <br />in the Panel Deployment Logs. These logs recorded the location, panel number, roll number, <br />date and time. Also recorded was the ambient temperature and current weather conditions <br />(wind speed, cloud cover, etc.), and thickness of the sheet. Designation of double -side textured <br />geomembrane was assigned a prefix of "DST" and the single -side textured geomembrane was <br />assigned a prefix of "SS". The SS liner deployed on the 4:1 slope consisted of 107 panels; listed <br />on the Deployment Logs as P-1 through P-107. The DST liner on the floor consisted of 72 panels; <br />listed as P-108 through P-179. The Deployment Logs are presented within Appendix I. <br />5.3.2.2 Field Seaming <br />Seam Layout: GLA's CCW Monitor documented the seaming of the HDPE liner in the <br />Seam/Pressure Test Logs. Seam numbers are determined by the panel numbers, i.e., seam <br />• 21/22 is the connection between HDPE panels 21 and 22. <br />Seaming Equipment and Products: GLA's CCW Monitor observed that the seaming equipment <br />used by the liner installer was in accordance with the project Specifications. In addition, GLA's <br />CCW Monitor observed that the extrudate (welding rod) used was compatible with the <br />geomembrane material and was comprised of the same resin as the geomembrane. <br />The liner installer, Comanco, seamed the HDPE geomembrane panels using double wedge and <br />extrusion welding techniques. The majority of seams were joined using double wedge welders, <br />with difficult geometry and repairs made using extrusion welders. <br />GLA's CCW Monitor observed the seaming activities, and observed each seam for sufficient <br />panel overlap, cleanliness, grinding where required, and the speed and the temperatures of the <br />equipment being used. Documentation of the activities was recorded on the geomembrane <br />Seaming Logs, which include information on the seam numbers, date, time, welding machine, <br />welding technician, machine temperature and speed, ambient temperature and wind <br />conditions. The geomembrane Seam/Pressure Testing Logs are included in Appendix I. <br />0 Seam Preparation: GLA's CCW Monitor observed that the preparation of the seams was in <br />23 Geo -Logic <br />ASSOCIATES <br />