Laserfiche WebLink
TABLE 8 <br /> FORWARD LANDFILL STAGE I PARTIAL CLOSURE AREA <br /> ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING <br /> COST ESTIMATE SUMMARY <br /> Item Unit Price Total <br /> No. Description Quantity �$) ($) <br /> 1 FINAL COVER INSPECTION MAINTENANCE AND REPAIR <br /> Inspection 12 hrs 50 per/hr $600 <br /> Cover Repair - —5,000 LS $5000 <br /> Subtotal $5 600 <br /> 2 LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE <br /> Inspect'onMaintenance <br /> Labo8 hrs 50 per/hr $400 <br /> Materials $900 to replace every 3 ears - 300 LS $300 <br /> Aerial Surve Once evea 5 yearsj($14,002LjXrsL 2,800 LS $2,800 <br /> Settlement Report <br /> Engineer 10 hrs 105 per/hr $1,050 <br /> Labor 6 hrs 50 peer 1 $300 <br /> Subtotal $4 850 <br /> 3 VEGETATIVE COVER INSPECTION <br /> Vegetation <br /> Inspection 4 hrs 50 er/hr $200 <br /> Soil Quality(first 3 years only) 29 acres 25 ac $725 <br /> Rodent Control 8 hrs 50 er/hr $400 <br /> Weed Dust and Fire Control 16 hrs 30 per/hr $480 <br /> Subtotal $1805 <br /> 4 BENCH MAINTENANCE <br /> Inspection <br /> Labor 4 hrs 50pe! hr $200 <br /> Repair <br /> Labor Materials - 2,000 LS $2,000 <br /> Subtotal $2200 <br /> 5 FRENCH DRAIN LEACHATE SEEP COLLECTORS MAINTENANCE/MONITORING <br /> Inspection and Maintenance - 400 LS $400 <br /> Leachate Sampling/Analysis - 200 LS 1 $200 <br /> Subtotal $600 <br /> 6 DRAINAGE CONTROL SYSTEM INSPECTION AND MAINTENANCE <br /> Inspection 8 hrs, 1 50 per/hrl per/hr $400 <br /> Repair 1,500 LS $1 5W <br /> Subtotal $1900 <br /> TOTAL ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING COSTS $16 955 <br /> TOTAL 30 YEAR POST-CLOSURE MAINTENANCE AND MONITORING COSTS $508,650 <br /> Forward Landfill PCPCMP <br /> L:\Allied\2000.193\Reports\FinaIPCPCMP:flpccost.xls:6/3/2005 <br />