My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT NO. 1 <br /> LABOR AND EQUIPMENT HOURLY RATES <br /> 0 <br /> Labor Region Per Hour Rate Overhead&Profit* Total Labor Costs <br /> Sr.Engineering Technician Central $45.21 $65 <br /> Heavy Equipment Operator Central $36.97 $53 <br /> Geologist/Engineer(1) Central $100.00 N/A $100.00 <br /> Sr.Engineer/Sr.Geologist(1) Central $125.00 N/A $125.00 <br /> Equipment Region Per Hour Rate Profit* Total Equipment Cost <br /> Pick-up Truck(3/4 Ton) Central $15.32 $17 <br /> High Pressure Sprayer(1,500 psi) Central $82.54 $91 <br /> Loader(Cat 966G) Central $126.79 $139 <br /> Dozer(Cat D8-N) Central $142.45 $157 <br /> Dump Truck(22 Ton) Central $66.34 $73 <br /> Water Truck(3,000 gal) $45.00 $50 <br /> Backhoe(Cat 44613) Central $52.86 $58 <br /> Mechanics Truck $45.00 $50 <br /> *Note:Labor overhead(i.e.,employee benefits,insurance,etc)calculated to 30%of base per hour rate. <br /> Profit calculated to be 10%of base per hourly rate and overhead(i.e.,office,supplies,benefits,etc),on labor <br /> rates only. <br /> (1)Typical consulting rates already includes,benefits and profit. <br /> ZAPROJECTS\Allied Waste\Forward\Five Year Permit Rvw 2013VTD-5 Yr PR 2013\gppendices\App A-PCPCMP 2013\Tables\Post-Closure Cost Back-up\Attach 1 Labor and Equipment <br /> back-up;5/28/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.