Laserfiche WebLink
ATTACHMENT NO. 1 <br /> LABOR AND EQUIPMENT HOURLY RATES <br /> 0 <br /> Labor Region Per Hour Rate Overhead&Profit* Total Labor Costs <br /> Sr.Engineering Technician Central $45.21 $65 <br /> Heavy Equipment Operator Central $36.97 $53 <br /> Geologist/Engineer(1) Central $100.00 N/A $100.00 <br /> Sr.Engineer/Sr.Geologist(1) Central $125.00 N/A $125.00 <br /> Equipment Region Per Hour Rate Profit* Total Equipment Cost <br /> Pick-up Truck(3/4 Ton) Central $15.32 $17 <br /> High Pressure Sprayer(1,500 psi) Central $82.54 $91 <br /> Loader(Cat 966G) Central $126.79 $139 <br /> Dozer(Cat D8-N) Central $142.45 $157 <br /> Dump Truck(22 Ton) Central $66.34 $73 <br /> Water Truck(3,000 gal) $45.00 $50 <br /> Backhoe(Cat 44613) Central $52.86 $58 <br /> Mechanics Truck $45.00 $50 <br /> *Note:Labor overhead(i.e.,employee benefits,insurance,etc)calculated to 30%of base per hour rate. <br /> Profit calculated to be 10%of base per hourly rate and overhead(i.e.,office,supplies,benefits,etc),on labor <br /> rates only. <br /> (1)Typical consulting rates already includes,benefits and profit. <br /> ZAPROJECTS\Allied Waste\Forward\Five Year Permit Rvw 2013VTD-5 Yr PR 2013\gppendices\App A-PCPCMP 2013\Tables\Post-Closure Cost Back-up\Attach 1 Labor and Equipment <br /> back-up;5/28/2013 <br />