Laserfiche WebLink
1-1 <br /> 1.0 PRELIMINARY CLOSURE PLAN AMENDMENT <br /> 1.1 Introduction <br /> The following Preliminary Closure/Post-Closure Maintenance Plan (PCPCMP) Amendment for <br /> Forward Landfill (FL) updates the existing Preliminary Plan prepared by Bryan A. Stirrat & <br /> Associates, Inc. (BAS), Lewis Engineering, and GeoLogic Associates (GLA) (dated 2002) and <br /> the subsequent revision submitted in 2004 (Amendment No. 2). Amendment No. 3, dated <br /> December 2008, was submitted by SWT Engineering (SWT) and approved by San Joaquin <br /> County Environmental Health Department (acting as the Local Enforcement Agency [LEA]) in <br /> January 2009. <br /> Spec+#+;Amendment No. 2 included language regarding the phased closure (partial <br /> closure) of the site including the associated reduction to the maximum extent of the landfill <br /> ever requiring closure, as well as, the accompanying closure cost estimate. Pursuant to Title <br /> 27 of the California Code of Regulations (27 CCR), Section 21790(a), the purpose of a <br /> Preliminary Closure Plan is to provide a basis to establish a preliminary estimate of closure <br /> costs and post-closure maintenance costs for the landfill. The 2002 PCPCMP met this <br /> requirement; however, the objective of Amendment No. 2 (BAS, dated 2004) +s—was to <br /> identify the information to gain agency approval. The information listed below <br /> this <br /> PCPCMP Amendment No. 3 (SWT, 2008) included <br /> ♦engineering Bdesign Pplans (i.g., Closure Sequencing Plans) presenting the <br /> anticipated staged closure of the FL, which also showeds existing and proposed final limits <br /> of waste placement (liner area); <br /> ♦----4an estimate of the maximum extent of the landfill that will ever require closure at <br /> any given time during the life of the landfill based on the Staged Closure Sequencing Plans; <br /> ♦ the aAnticipated closure schedule for the initial closure stage based on volumetric <br /> calculations; and <br /> ♦ Aa revised closure cost estimate based on the maximum extent of the landfill ever <br /> requiring closure as based on the&closure &sequencing configuration. <br /> This 2013 Amendment (Amendment No. 4-3, dated May 2013) provides <br /> updated information reflecting the implementation of the Stages IA and IB closure and post- <br /> closure cost estimates prepared in compliance with 27 CCR and the subsequent reduction <br /> of the maximum extent of area ever needing closure over the active life of the landfill. The <br /> closure and post-closure cost estimates have been updated, along with supporting back-up, <br /> as part of the Five-Year Permit Review requirements. <br /> Forward Landfill SWT Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\itd-5 yr pr 2013\appendices\app a-pcpcmp 2013\text\pcpcmp amend <br /> 2013.doc <br />