Laserfiche WebLink
CalRecycle <br /> Disposal Facility inspection Report (52} <br /> r✓njrcementsAg'en c� Gouoty of San-Joaquin <br /> ,.� <br /> N. <br /> 1—MO S aOWmbe , s ... p*ect� ogram i a <br /> 39-AA-0015 1/25/2013 LEA Periodic <br /> m_e_Trt <br /> 5:30AM $A'ine "a End ecionTrm <br /> Forward Landfill, Inc. Forward, Inc./Allied Waste-North America <br /> faa'- <br /> ,V, Lo a long �wne�,i ame . <br /> _ a ; <br /> 9999 S.Austin Road, Manteca 95336 <br /> frzspecfor :� Presen3ame} e . <br /> Michael Kith JHarprit Mattu, EHD; Ruben Ramirez, Landfill Manage <br /> THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OFTHE DIVISION 30 OF THE PUBLIC RESOURCES CODE(PRC)AND ME 14 AND TM_E 27 CALIFORNIA CODE OF REGULATIONS(CCR) <br /> WON <br /> Na vrota�o or 4e as ofonce c -:. ' .. <br /> ;ix ' <br /> X PRC 44014(b)-Operator Complies with Terms & Conditions <br /> Comments: In the early hours of operation, no one is directing the traffic. The traffic is gridlocked. The trucks <br /> are parked in a disorganized manner and extend onto ramp leading to working face. There is no clear pattem for <br /> traffic and safety is a concern. At time of inspection. in the early hours of operation, there are one spotter at the <br /> dumping area, one dozer operator, one loader operator, and 2 to 3 personnel removing the tarps. <br /> -Part 17 of Solid Waste Facility Permit, EA Condition "y" states "The operator shall at all times provide adequate <br /> staffing to deal effectively and promptly with operation at the site as needed." <br /> -Provide adequate staffing for the early hour of operation. <br /> x 20580 - Lighting <br /> Comments: There is no light near the tippers area. It appears the truck drivers operate the tippers in darkness. <br /> The spotter is also working in darkness. <br /> -Provide adequate lighting. <br /> � r � <br /> 9nsp ct,am2epor#Cgmments ' _ «_ r <br /> Notes: <br /> 1. There is no ponding at time of inspection. The major erosions had been repaired. The operator is now working on <br /> repairing the smaller erosions as weather permits. <br /> 2. The cover consists of soil and tarps. <br /> 3. The secondary gate is opened before the employees are ready for the daily operation. <br /> 4. There are lot of whole tires in the waste at the active face. According to the operator, Forward gets permission to <br /> receive bailed tires. the ties of the bails break as the personnel pushes the bail. The operator is to take every effort not <br /> to break the ties of the tire bail <br /> 5. The concentration of explosive gas in GP-11, 12 and 28 is 0% by volume. <br /> 6. All records are up to date. <br />