Laserfiche WebLink
® SECTION 6 <br /> Summary <br /> This report presents the construction documents and supporting design criteria required for <br /> completion of WMU FU-13 at the Forward Landfill. Design calculations have been performed and <br /> construction documents prepared to demonstrate that the design of this unit complies with Forward's <br /> WDRs,and Title 27 requirements. <br /> These Design and Construction Documents have been prepared under the supervision of Sangeeta P. <br /> Lewis,whose seal as a Registered Professional Engineer in the State of California is affixed below. <br /> -MIAS, <br /> C/O c �? <br /> CE, NO. Ce,7735 <br /> CC11rr <br /> QVI <br /> SANGEETA P.LEWIS RCE 47735 C = : <br /> WMU FU-13 REPORT.DOC 6-1 <br />