Laserfiche WebLink
® SECTION 7 <br /> References <br /> Brian A. Stirrat Associates(BAS)et al.,Joint Technical Document,Forward Landfill,June 2003. <br /> Brian A. Stirrat Associates(BAS)et al.,Design Report for the Waste Management Unit (WMU)FU- <br /> 03 and WMUF--West,Forward Landfill,August 2003. <br /> Brian A. Stirrat Associates(BAS)et al.,Design Report for the Waste Management Unit FU-04, <br /> Forward Landfill,April 2004. <br /> Brian A. Stirrat Associates(BAS)et al.,Design Report for the Waste Management Unit FU-05, <br /> Forward Landfill,February 2005. <br /> Bray,J.D.,et al.,"Simplified Seismic Design Procedure for Geosynthetic-Lined, Solid Waste <br /> Landfills,"Geosynthetics International,Vol. 5,Nos 1-2, 1998. <br /> CH2M HILL, Comprehensive Landfill Description, Forward Landfill Inc., January 1992. <br /> CH2M HILL,Design and Construction Documents, WMU D-93,Forward Inc.Landfill,April 1993, <br /> (1993a). <br /> CH2M HILL,Report of Waste Discharge, 1993 Permit Revisions, Forward, Inc.Landfill, San <br /> Joaquin County,California,June 1993,(1993b). <br /> C2 HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward,Inc. Landfill, San <br /> Joaquin County,California, September 1993,(1993c). <br /> CH2M HILL, Construction Quality Assurance Report, WMUD-93, Forward,Inc.Landfill,January <br /> 1994,(1994a). <br /> CH2M HILL,Buena Vista Landfill, Module 3. Design, Construction, and Operations Documents. <br /> Prepared for County of Santa Cruz,March 1994,(1994b). <br /> CH2M HILL,Design and Construction Documents, WMU D-94,Forward Inc. Landfill,June 1994, <br /> (1994c). <br /> CH2M HILL,Buena Vista Landfill, Module 3. Construction Quality Assurance Report. Prepared for <br /> County of Santa Cruz,November 1994,(1994d). <br /> CH2M HILL, Construction Quality Assurance Report, WMUD-94, Forward,Inc.Landfill,December <br /> 1994,(1994d). <br /> CH2M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward,Inc. Landfill, San <br /> Joaquin County, California,Revised December 1994,(1994e). <br /> CI-12M HILL,Design and Construction Documents, WMUD-95,Forward Inc.Landfill,January <br /> 1995,(1995a). <br /> CH2M HILL, Construction Quality Assurance Report, WMU D-95, Forward Inc. Landfill,October <br /> 1995, (1995b). <br /> CH2M HILL, Clay Versus GCL Base Liner Memorandum, Figure 213,February 24, 1997,(1997a). <br /> WMU FU-13 REPORT.DOC 7-1 <br />