Schroeder,P.R.,Peyton, R.L.,McEnroe, B.M., and Sjostrom, J.W.,The Hydrologic Evaluation of
<br /> Landfill Performance(HELP)Model. User's Guide for Version 2,U.S.Army Engineer Waterways
<br /> Experiment Station,Vicksburg,MS. October 26, 1988.
<br /> Sharma,H. D., and Lewis, S.P., Waste Containment Systems, Waste Stabilization, and Landfills:
<br /> Design and Evaluation.John Wiley and Sons,New York, 1994.
<br /> Sharma, S.,XSTABL,An Integrated Slope Stability Analysis Program for Personal Computers,
<br /> Version S, Interactive Softward Designs,Inc.,2003
<br /> Singh, S.Evaluation of the Strength and Stability of Sanitary Landfills, Santa Clara University,July
<br /> 1989.
<br /> Spangler,M.G.,and Handy,R.L.,Soil Engineering, 4`"Edition,Harper Collins, 1982.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUD-98 and the WM7JD-
<br /> 94 Extension at the Forward, Inc. Landfill,January 1999,(1999a).
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUD-99, Class II Leachate
<br /> Impoundment, and Closure of the Eastern Ash Pit at the Forward, Inc. Landfill, September 1999
<br /> (1999b).
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMU D-02 at the Forward,
<br /> Inc. Landfill, 2002.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUART-03 at the Forward,
<br /> 1p Inc. Landfill, 2003.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUFU--03 at the Forward,
<br /> Inc. Landfill, 2003.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUFU--04 at the Forward,
<br /> Inc. Landfill, 2004.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUFU--05 at the Forward,
<br /> Inc. Landfill, 2005.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUFU--06 at the Forward,
<br /> Inc. Landfill, 2006.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUFU--08, Phase 1 at the
<br /> Forward, Inc. Landfill, 2008.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUFU--08 North at the
<br /> Forward, Inc. Landfall, 2009.
<br /> Vector Engineering,Final Construction Quality Assurance Reportfor WMUFU--10 at the Forward,
<br /> Inc. Landfill, 2010.
<br /> Von Pein,R.T. and Prasad, S.,"Composite Lining System Design Issues,"Proceedings of the Fourth
<br /> GRI Conference,December 1990.
<br /> WMU FU-13 REPORT.DOC 7-3
<br />
|