Laserfiche WebLink
I <br /> = REMOVE PLYWOOD J <br /> J <br /> REMOVE FILTER F <br /> EXISTING GEOTEXTILE <br /> PERIMETER w <br /> BERM PLYWOOD <br /> w FILTER <br /> �. w GEOTEXTILE PERIMETER <br /> BERM <br /> (� <br /> GEOGRID I --s-.�-__ �1 � <br /> -X- <br /> [Su CUSHION GEOTEXTILE <br /> 1 BGRADE CUSHION GEOTEXTILE �( p <br /> / SUBG L FILL \ <br /> / Z 60 and DOUBLE TEXTURED (III `-SUBGRADE FILL O <br /> FILL 60 m8 DOUBLE TEXTURED w HDPE GEOMEMBRANE <br /> 3'MIN ANCHOR HDPE GEOMEMBRANE ANCHOR <br /> TRENCH GEOGRID TRENCH <br /> CF r: 3'MIN a <br /> SUBGRADE FILL <br /> SECTION im SECTION <br /> NTS SEE NOTE 3 SHT 3 NTS SHT 3 <br /> O <br /> N <br /> co <br /> In <br /> N <br /> �ZFw N <br /> OOU A <br /> Q rw <br /> PROTECTIVE OPERATIONS LAYER <br /> CUSHION — <br /> FILTER Z <br /> GEOTEXTILE GEOTEXTILE � <br /> 60 and DOUBLE III—I I 1—III <br /> TEXTURED HDPE <br /> GEOMEMBRANE 0.5'MIN GRANULAR <br /> GEOCOMPOSITE DRAINAGE MATERIAL <br /> \ DRAINAGE NET <br /> `-GEOGRID REMOVE EXISTING Z <br /> SOIL BERM <br /> 60 md SINGLE GRANULAR DRAINAGE 1'MIN PROTECTIVE W Z <br /> / TEXTURED HDPE <br /> MATERIAL OPERATIONS LAYER REMOVE 60 and HDPE Z <br /> GEOMEMBRANE Z GEOMEMBRANE <br /> GEOSYNTHETIC g VARIES --REFUSE Z . <br /> CLAY LINER BY <br /> OWNER) W G ; <br /> — N <br /> 1 0.5-MIN-/'I v <br /> GEOGRID GRANULAR BACKFILL WITH Lu <br /> J O <br /> i� FILTER DRAINAGE EXISTING GENERAL EARTHFILL <br /> a FILTER GEOTEXTILE <br /> ¢ GEOGRID GEOTEXTILE CUSHION MATERIAL VEGETATIVE EXISTING REMOVE (SEE NOTE 1) <br /> 10'MIN <br /> GEOTEXTILE LAVER CLAY LINER COARSE GRAVEL GEOGRID CLAY PLUG 3'MIN EXISTING REMOVE 3-INCH DIA <br /> SUBGRADE Flll ^ FOUNDETTiON \ PERFORATED HDPE PIPE <br /> "''((( <br /> LAY <br /> SECTION *p` `REFUSE <br /> TOP DECK CONNECTION /SHT 3 <br /> NTS Z m <br /> NOTES: M p <br /> j po <br /> 1. OVERLAP EXISTING AND NEW GEOSYNTHETICS A MINIMUM 3-FEET. g o <br /> 2. PLACE TEXTURED SIDE OF GEOMEMBRANE AGAINST CLAY LINER OR GCL. y <br /> 3. REMOVE EXISTING GEOSYNTHETICS FROM EXISTING ANCHOR TRENCH. w <br /> OVERLAP GEOSYNTHETICS A MINIMUM OF 3-FEET.WELD THE EXISTING U <br /> AND NEW 60-mil HDPE GEOMEMBRANE. <br /> w <br /> ®!.1MNIi <br /> Rev <br />