Laserfiche WebLink
Aft <br /> 2014 <br /> 2/4/14 7:36 2/4/14 7:55 0.3 Shutdown during PGF Testing/reset controls <br /> 2/4/14 8:28 2/4/14 8:48 0.3 Shutdown during PGF Testing/reset controls <br /> 4/30/14 8:45 4/30/14 9:18 0.5 Testing of flare call out alarms <br /> 4/30/14 12:08 4/30/14 15:20 3.2 Testing of flare call out alarms and flare maintenance <br /> 5/1/14 3:26 5/1/14 13:13 9.8 construction activities on LFG header <br /> 5/3/14 2:37 5/3/14 8:53 6.3 construction activities on LFG header <br /> 5/3/14 9:20 5/3/14 12:23 3.0 construction activities on LFG header <br /> 5/5/14 11:00 5/5/14 12:47 1.8 testing of flare <br /> 5/5/14 13:46 5/5/14 14:12 0.4 testing of flare <br /> 5/6/14 11:48 5/6/14 15:16 3.5 source test of other flare <br /> 6/17/14 11:19 6/17/14 14:16 3.0 <br /> 6/25/14 4:43 6/25/14 11:39 6.9 <br /> Flare Downtime 2014 Hours 2014_ 38.4 <br /> Flare No 1 Runtime 2013/2014 <br /> Started Shutdown Runtime Hours <br /> 5/2/13 9:38 5/2/13 11:39 2.0 Test run for source test <br /> 5/6/13 6:23 5/6/13 11:02 4.6 Pre-Source Test <br /> 5/7/13 8:07 5/7/13 16:15 8.1 Source Testing <br /> 5/5/14 8:38 5/5/14 8:52 0.2 testing of flare operations for source test <br /> 5/5/14 8:59 5/5/14 10:03 1.1 testing of flare operations for source test <br /> 5/5/14 11:12 5/5/14 12:26 1.2 testing of flare operations for source test <br /> 5/6/14 11:56 5/6/14 15:02 3.1 Source testing <br /> Flare Runtime Hours For 2014= 5.6 <br />