Laserfiche WebLink
e Project Name Lptrr L G, <br /> InspectdVALUE <br /> or's Name -SV�N 1IL 4I$N N� <br /> Unit Tested WA O- ENGINEERING <br /> DateI d 2? I <br /> ANNUAL LCRS CONTINUITY TEST INSPECTION <br /> (C) TRACER DYE DETECTION MONITORING LOG <br /> Pump start time: ��a� 8AIApproximate pump flow rate:_ <br /> Does the pump reading indicat continuous flow? Yes A, No� <br /> Time Flow Rate(gpm) Tracer Dve Detected(YM <br /> 12- 02- ^- <br /> ( 1193 <br /> Was tracer dye detected from the LCRS sump? Yes 3ZNo <br /> If Yes,state approximate migration time to detection <br /> If No,state possible reason N/- <br /> Remedial Action Work Order Date Completed Signature <br /> Signature of Inspector <br /> e <br /> Page 2 of 2 <br />