My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:56:18 PM
Creation date
7/3/2020 10:57:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Progress Report—Fourth Quarter 2014 <br /> Austin Unit,Forward Landfill Paye 3 <br /> • November 19,3:21 p.m.—3:29 p.m.:Flare A-2 shut down for adjustment and testing. <br /> • December 29, 12:50 p.m.—1:30 p.m.:Flare A-2 shutdown for flow meter calibration. <br /> Based on information provided by SCS Field Services,Inc.,the landfill gas extraction and destruction <br /> system operated at approximately 1,793 to 3,000 cubic feet per minute during the fourth quarter 2014. <br /> This is equivalent to about 2,582,000 to 4,320,000 cubic feet per day. Based on the data presented in <br /> the June 30,2014 Annual Compliance Emissions Test Report prepared by Blue Sky Environmental, <br /> Inc.,Flare A-2 destroys an average of 37.2 lbs/hour of non-methane organics,and back-up Flare A-1 <br /> destroys an average of 15.2 lbs/hour of non-methane organics. Non-methane organics are considered <br /> equivalent to VOCs- During the period of October I through December 31,2014,Flare A2 operated <br /> approximately 2,205 hours out of a possible 2,208 hours(99.9%operational rate). At the average VOC <br /> destruction rate provided in the Source Test Report,Flare A-2 destroyed approximately 82,026 pounds <br /> of VOCs during the fourth quarter 2014. <br /> Attached is a copy of monitoring results for individual landfill gas extraction points during the fourth <br /> quarter 2014 as provided by SCS Field Services,Inc. <br /> If you have any questions,please contact Mr.Don Litchfield at(209)982-4298. <br /> Sincerely, <br /> HERST&ASSOCIATES,INC. <br /> Ward Herst,PG,HG Andrew Wyatt <br /> Managing Partner Senior Environmental Scientist <br /> cc: Erin Fanning—Forward,Inc. <br /> Don Litchfield—Forward,Inc. <br /> Bill Lopez—Geo-Logic Associates <br /> Victoria Warren—Republic Services <br /> Attachments: Del-Tech Third Quarter 2014 Groundwater Treatment System Monitoring Logs <br /> SCS Field Services Third Quarter 2014 Landfill Gas Extraction Point Monitoring <br /> Results <br />
The URL can be used to link to this page
Your browser does not support the video tag.