Laserfiche WebLink
Quarterly Progress Report—Fourth Quarter 2014 <br /> Austin Unit,Forward Landfill Paye 3 <br /> • November 19,3:21 p.m.—3:29 p.m.:Flare A-2 shut down for adjustment and testing. <br /> • December 29, 12:50 p.m.—1:30 p.m.:Flare A-2 shutdown for flow meter calibration. <br /> Based on information provided by SCS Field Services,Inc.,the landfill gas extraction and destruction <br /> system operated at approximately 1,793 to 3,000 cubic feet per minute during the fourth quarter 2014. <br /> This is equivalent to about 2,582,000 to 4,320,000 cubic feet per day. Based on the data presented in <br /> the June 30,2014 Annual Compliance Emissions Test Report prepared by Blue Sky Environmental, <br /> Inc.,Flare A-2 destroys an average of 37.2 lbs/hour of non-methane organics,and back-up Flare A-1 <br /> destroys an average of 15.2 lbs/hour of non-methane organics. Non-methane organics are considered <br /> equivalent to VOCs- During the period of October I through December 31,2014,Flare A2 operated <br /> approximately 2,205 hours out of a possible 2,208 hours(99.9%operational rate). At the average VOC <br /> destruction rate provided in the Source Test Report,Flare A-2 destroyed approximately 82,026 pounds <br /> of VOCs during the fourth quarter 2014. <br /> Attached is a copy of monitoring results for individual landfill gas extraction points during the fourth <br /> quarter 2014 as provided by SCS Field Services,Inc. <br /> If you have any questions,please contact Mr.Don Litchfield at(209)982-4298. <br /> Sincerely, <br /> HERST&ASSOCIATES,INC. <br /> Ward Herst,PG,HG Andrew Wyatt <br /> Managing Partner Senior Environmental Scientist <br /> cc: Erin Fanning—Forward,Inc. <br /> Don Litchfield—Forward,Inc. <br /> Bill Lopez—Geo-Logic Associates <br /> Victoria Warren—Republic Services <br /> Attachments: Del-Tech Third Quarter 2014 Groundwater Treatment System Monitoring Logs <br /> SCS Field Services Third Quarter 2014 Landfill Gas Extraction Point Monitoring <br /> Results <br />