Laserfiche WebLink
FORWARD LANDFILL <br />• DAELY PRE -APPLICATION INSPECTION FORM <br />Waste Discharge Requirements Order No. R5-2014-0006 <br />Weather conditions: <br />Temperature: <br />Wind ditectioln: -(a- Wind speed: <br />Other relevant field conditions: <br />Evidenceof erosion ................................................................................... No .............................. o Yes <br />Berba condition ................................................. * ..........................................CZ09(d ......................... 0 Needs attention <br />Soilsaturation .............................................................................. ................ 0 No........................--_... 0 Yes <br />Ponding--------------------------------------------------------------------------------------------------------- Cf N .............................. C3 Yes <br />Potential runoff to off-site areas .............................................................Ed �N .............................. 0 Yes <br />C Nor. <br />Potential discharge- to surface water ...................................................... N .............................. o Yes <br />Actual discharge to surface water---------------------------------------------------------- Z p .............................. o Yes <br />Accumulation of organic solids .............................................................. N ............................... 0 Yes <br />Soilclogging ----------------------------------------- : ....................................................... �- No...................._......... o Yes, <br />Odors that have the potential to be objectionable at or <br />beyond the property boundary ...............................................................N c�.............................. o Yes <br />N <br />Vectors (insects, rodents) ...................................................... * <br />............... No......:........ 0 Yes <br />Documented observations requiring corrective action and corrective action taken (if applicable): <br />Note: No valves are required as part of the land application operation. <br />•Date/time: / �/ Lai `(@ 1, 1 Title: Operations Manager <br />Signature: — <br />Af 4- <br />Ruben Ramirez <br />