Laserfiche WebLink
Project Name FOKWA{LD LAWIb&LL <br /> Inspector's Name SUmIL S PAN I 4VAJAUE <br /> Unit Tested Mu—we ENGINEERING <br /> Date -22 20l -k <br /> ANNUAL LCRS CONTINUITY TEST INSPECTION <br /> (C)TRACER DYE DETECTION MONITORING LOG <br /> Pump start time: r 1 *�O uh S/23 Approximate pump flow rate: <br /> Does the pump reading indicate continuous flow? Yes No <br /> Time Flow Rate gpm) Tracer Dye Detected(YIN) <br /> 1&D ^Lo-�rn, N'o <br /> eon.ey�d Jent <br /> Was tracer dye detected from the LCRS sump? Yes-X—No <br /> If Yes,state approximate migration time to detectionn� 2,'��t�,v� <br /> If No, state possible reason YA- <br /> Remedial Action Work{.order Date Completed Signature <br /> � r <br /> Signature of Inspector <br /> Page 2 of 2 <br />