Laserfiche WebLink
2.5 LABELING <br /> A. Mark or tag geotextile rolls with the following information: <br /> 1. Manufacturer's name. <br /> 2. Product identification. <br /> 3. Lot number or date. <br /> 4. Roll number. <br /> 5. Roll dimensions. <br /> B. Mark special handling requirements on rolls. <br /> 2.6 DAMAGED GEOTEXTILE <br /> A. Geotextile damaged during transportation, loading,unloading,and delivery shall be <br /> documented by the QA/QC CONSULTANT. <br /> B. The GEOSYNTHETICS CONTRACTOR shall repair geotextile damaged before <br /> delivery to the satisfaction of the QA/QC CONSULTANT. If the geotextile can not <br /> be repaired to the satisfaction of the QA/QC CONSULTANT, the damaged <br /> geotextile shall be replaced by the GEOSYNTHETICS CONTRACTOR,at no cost <br /> to the OWNER. <br /> PART 3 EXECUTION <br /> 3.1 EXAMINATION <br /> A. Prior to installation of geotextile,examine underlying construction for conformance <br /> with specifications. <br /> 3.2 PROTECTION <br /> A. When placing soil materials over geotextile ensure the following: <br /> 1. No damage to geotextile. <br /> 2. No slippage of geotextile on underlying layers. <br /> 3. No excessive tensile stresses in the geotextile. <br /> B. Ensure that geotextiles are covered within 10 days of deployment. <br /> 3.3 DEPLOYMENT <br /> A. Follow manufacturer's recommendations, standards, and guidelines. <br /> B. Roll geotextile down slope keeping the geotextile sheet in sufficient tension to <br /> prevent folds and wrinkles. <br /> C. Weight geotextile with sandbags,or equivalent,to ballast during deployment. Leave <br /> ballast in place until geotextile is covered with succeeding construction layer. <br /> Forward Landfill WMU FU-14 <br /> 02771 5 GEOTEXTILES <br />