My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 9:58:07 AM
Creation date
7/3/2020 10:57:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Reporting observations and test results as the work progresses <br />The QA/QC inspection personnel will work under the supervision and guidance of the QA/QC <br />Manager. Inspection personnel will perform onsite inspections of the construction and determine <br />whether the work meets the requirements of the Construction Drawings and Specifications. Field <br />tests and visual observations will be used to evaluate construction practices. If QA/QC inspection <br />personnel observe poor construction practices, the QA/QC Manager will be notified immediately. <br />QA/QC inspection personnel will be responsible for verifying that all testing is conducted in <br />accordance with American Society for Testing Materials (ASTM) standards or other specified test <br />methods and that the proper test equipment is used. The results of all inspections, including work <br />that is unacceptable, will be reported to the QA/QC Manager. <br />2.2.5 Responsibilities of the Design Engineer <br />The Design Engineer is responsible for site engineering services related to the design. Those <br />services include reviewing Contractor submittals, resolving technical issues related to construction, <br />providing interpretation of the Construction Drawings and Specifications and approving substantial <br />design modifications and technical revisions. <br />2.3 Control of Documents, Records, and Forms <br />2.3.1 Project Control of Contract Documents <br />® Contract documents, including Specifications, Construction Drawings, and change orders, are <br />controlled by the Construction Manager. The Construction Manager maintains one or more copies <br />of the most current set of contract documents for use by the QA/QC Consultant. Upon issuance of <br />new copies or revisions, it is the responsibility of the Construction Manager to notify the Earthwork <br />and Geosynthetic Contractors of the revisions and provide revised contract documents. The <br />Construction Manager also provides the latest revised set of contract documents to the QA/QC <br />Consultant. <br />2.3.2 Project Control of As -Built Information <br />The QA/QC Manager controls as -built information generated by the Owner, Contractor and QA/QC <br />Consultant. During the progress of the work, the QA/QC Manager obtains as -built information <br />provided from the QA/QC Inspectors, Contractor, surveyors, or others. The as -built information <br />shall be incorporated in the final CQA report. <br />2.3.3 Project Control of Forms <br />Daily report forms, test report forms, and other project forms are controlled by the QA/QC Manager <br />who maintains a master of each form for copies. Upon issuance of a new form, the QA/QC Manager <br />must recall and remove all superseded copies along with the master, notify the QA/QC Inspectors, <br />and provide new copies for their use. <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.