Laserfiche WebLink
California and responsible for overseeing completion of quality assurance earthwork observation, <br />inspection and soil testing. <br />"Independent Testing Laboratoi�" - The firm responsible for conducting tests on soils samples <br />"Landfill En 'neer" - The firm responsible for design and preparation of the Project Drawings <br />and Specifications. All completed work is subject to approval by the Landfill Engineer. <br />"Owner" - The owner of the site, in this case, Allied Waste Industries, Inc. <br />"Project Documents" - All Contractor submittals, Construction Drawings, Record Drawings, <br />"As -Built" Plans, Construction Specifications, CQA Plan, Health and Safety Plan and Project <br />Schedule. <br />"Project Manager" - Allied Waste's designated representative responsible for the project. <br />"Protect Drawings, Plans and Specifications" - All project related Drawings and Specifications <br />including design modifications and Record Drawings. <br />"CQA Officer" - The representative for the Geotechnical CQA Consultant who will be <br />responsible for overall review, observation, sampling and testing activities for construction. <br />"CQA Monitors" The individuals working under the direction of the CQA Officer. Such <br />personnel include "Technicians", Field En ' eers and _ Field Geolo 'gists representing the <br />Engineer and Geotechnical CQA Consultant. CQA Monitors responsible for the earthwork, shall <br />be experienced in landfill construction monitoring, soil construction and compaction testing <br />during grading operations. <br />"Work" - All tools, equipment, supervision, labor, and materials or supplies necessary to <br />complete the project as specified herein and as shown on the Project Drawings. <br />The CQA Team will consist of design and field personnel with specific experience in the <br />inspection and CQA monitoring of earthwork activities related to landfill alternative final cover <br />construction. Figure 1 shows the CQA Project Organization Chart for the project with principal <br />functions of the CQA team presented below: <br />10 <br />GLA/2005-0OSMRWARD/CQAPI.AN.dod7/194005 <br />Geologic Associates <br />