My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 10:03:14 AM
Creation date
7/3/2020 10:58:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
742
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Review Contractor performance. <br />• Discuss project related problems. <br />• Discuss the Contractor's personnel and equipment assignments. <br />• Review the previous week's activities and accomplishments. <br />Weekly progress meetings shall be documented by the Construction Manager or his <br />representative and minutes shall be distributed to all parties. <br />4.3 SPECIAL MEETINGS <br />Special meetings will be conducted as required to discuss problems or deficiencies. At a <br />minimum, these meetings will be attended by the Construction Manager, the CQA staff and the <br />Contractor. If the correction of a problem requires a design modification, the <br />Engineer and the Geotechnical CQA Consultant will also be present. The purpose of these <br />meetings is to: <br />• Define and discuss any problems or deficiencies in the project. <br />• Review possible corrective actions or solutions. <br />I* • Implement an action plan to resolve the problems or deficiencies. <br />Special meetings shall be documented by the Construction Manager or his representative and <br />minutes shall be distributed to all parties. <br />5.1 GENERAL <br />The following earthwork requirements present the generally accepted standards and minimum <br />requirements for earthwork grading operations to be used in development of the project. These <br />specifications shall be the project requirements for earthwork except where specifically <br />superseded by prevailing guidance documents of the controlling agency. <br />5.2 SPECIFICATIONS <br />A. The Contractor shall be solely responsible for the satisfactory completion of all earthwork in <br />accordance with the Project Drawings and Specifications. <br />B. Equipment used in the excavation, transport, mixing, stockpiling, processing, installation and <br />compaction of all materials used in construction of the alternative final cover improvements <br />-9- <br />GLA/20050082/FORWARD/CQAPLAN.doM7/15/2005 <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.