Laserfiche WebLink
0 7.0 DOCUMENTATION <br />To provide evidence of satisfactory work performance, all stages of alternative final cover <br />construction shall be documented. The information shall be recorded on a standardized form or <br />in a bound field logbook. <br />7.1 DAILY RECORD KEEPING <br />The purpose of daily record keeping is to record construction activities, including results of <br />continuous visual observations; laboratory/field test data; sampling; review of test results; <br />repairs; problems; solutions and general field activity. The CQA Monitor(s) shall keep a Daily <br />Field Inspection Report of project activities. At a minimum, this report shall include the <br />following: <br />• Date and project identification. <br />• Field activity and work locations. <br />• Summaries of field communications. <br />• Summary of equipment and personnel used. <br />• Work activity monitored, general location on-site and any related tests taken. <br />• Record of material sampling and testing activities. <br />• Any variance from specified methods and standards. <br />• Estimated quantities of material placed and compacted. <br />• Unusual events. <br />• Actions regarding acceptance/rejection of work. <br />Weather conditions. <br />• Signature of person preparing the report. <br />The daily field inspection report shall be reviewed by the QA Manager and shall be submitted to <br />the Construction Manager. One complete set of both daily reports shall be kept on site by the <br />CQA personnel at all times. The contractor will be notified of the "pass/fail" nature of the CQA <br />results but will be provided with numerical data only at the discretion of the Construction <br />Manager. Release of the QA data to the Contractor would be for convenience only and would, in <br />no way, relieve the Contractor from sole responsibility for fulfilling the project requirements. <br />The Construction Manager shall prepare a photographic record as part of the construction control <br />activities. Photographs shall be in color and shall include photographs of construction activities, <br />problem areas, corrective actions, and final constructed features. Photographs shall be identified <br />with the site designation, the date taken, the location, and a description of the activity covered by <br />the photograph. <br />7.3 AS -BUILT DOCUMENTATION <br />As the work is completed, final Record Drawings and a report shall be prepared under the <br />direction of the Engineer and Construction Manager utilizing the record prepared during <br />-15- <br />GLA/2005-0082/FOR WARD/CQAPLAN.dod7/15/2005 <br />Geologic Associates <br />