5-11 <br />The existing flare station is located in the northeastern portion of the landfill (Drawing 11). <br />The flare station consists of two enclosed ground flares that have a combined capacity of <br />approximately 5,400 cubic feet per minute (cfm). The landfill gas is routed to the existing <br />flare station. Landfill gas will be routed to the new LFGTE when it becomes operational and <br />the remainder will be flared. <br />As landfill gas cools within the gas extraction system piping, condensate is formed. <br />Condensate generation is dependent upon gas flow and variations in ambient temperatures. <br />Along with the gas extraction system, a condensate management system handles <br />condensate that collects in the low points of the landfill gas extraction system piping. <br />Condensate from these low points is gravity -fed to the leachate ponds. <br />5.3 Design Calculations <br />5.3.1 Soil Balance <br />Soil excavated from each phase (Table 9) will be stockpiled in areas of future phases or on <br />the borrow area north of the landfill. This stockpiled soil can be utilized for daily cover <br />operations, if needed, or will be saved for final cover soil needs (approximately 564,974 cy). <br />The existing Forward Landfill currently accepts construction debris and contaminated soil in <br />sufficient quantities to generally provide for daily cover operations. Table 10 presents phase <br />fill and soil volumes required for each phase as well as soil available onsite and import or <br />borrow required. Any soil surplus or deficit will be stockpiled/borrowed from the existing <br />borrow area located north of the landfill. Landfill capacity/soil calculations are included in <br />Appendix F. <br />5.3.2 Static and Seismic Stability <br />The stability of the Forward Landfill was evaluated by based on the development plans and <br />available information regarding likely refuse, soils, and liner materials. As required in 27 <br />CCR, the analyses addressed both the surficial stability of final cover soils and the gross <br />stability of the final landfill contours. The analyses considered static and pseudo -static <br />loading conditions, and included evaluation of the seismic displacement that could occur <br />under earthquake loads. A copy of GLA's analysis (2001) is included in Appendix K. <br />5.3.2.1 Seismicity <br />An assessment of the seismic exposure for the Forward Landfill site was completed by <br />Geosyntec Consultants (2001) and is included in Appendix K. Based on that assessment, <br />two potential earthquake events were considered for design: a MCE of Mw 7.9 associated <br />with the San Andreas Fault at a distance of about 70 miles; and a Mw 6.7 earthquake <br />associated with the Great Valley (Segment 7) Fault at a distance of about 21 miles. The <br />to following parameters were used in the seismic slope stability evaluations: <br />Forward Landfill SWT Engineering <br />Joint Technical Document - April 2014 <br />z:\projects\allied waste\forward\five year permit rvw 2013\itd-5 yr pr 2013\text\sec 5 final.doc <br />