Laserfiche WebLink
vi <br />8'0 DISPOSAL SITE RECORDS AND REPORTING PROCEDURES ........................................... <br />8-1 <br />8.1 <br />Operating Record ................................................................................................ <br />8-1 <br />8.2 <br />Weight/Volume Records .................................................................................... <br />8-1 <br />8.3 <br />Subsurface Records ........................................................................................... <br />8-2 <br />8.4 <br />Special Occurrences ........................................................................................... <br />8-2 <br />8.5 <br />Beneficial Reuse ................................................................................................. <br />8-2 <br />8.6 <br />Location and Inspection OfRecords .................................................................. <br />8-2 <br />9.[) REFERENCES <br />..................................................................................................................... <br />9-1 <br />TABLES <br />Table 1: <br />SVVRCBJTO |Dd8X <br />Table 2: <br />C@|ReCyC|8JTOIndex <br />Table 3: <br />Summary OfSite Areas <br />Table 4: <br />Regional Faults and Estimates OfGround Accelerations in Bedrock <br />Table 5: <br />Summary OfGeotechnical Investigations <br />Table 6: <br />Intensity -Duration -Frequency for 1,000 Year Return Period <br />Table 7: <br />{|a|CU!@ted Hydraulic Conductivities <br />Table 8: <br />Diminishing Landfill Capacity <br />Table 9: <br />Excavation Volumes <br />Table 10: <br />Phase Fill and Soil Volumes <br />Table 11: <br />Emergency Contact List <br />Table 12: <br />Medical Emergency Contact List <br />Table 18: <br />Agency Notification for Hazardous Waste Disposal Incidents <br />Table 14: <br />Equipment List <br />Table 15: <br />Analytical Para mete re/M8thOds/Fr8quenCy <br />Table 16: <br />Estimated Groundwater Mitigation Costs and Open5tiO»/M@iOteD0DOeCOStS <br />FIGURES <br />Figure 1: <br />1,C)D[)ftRadius/Land Use Map <br />Figure 1A: <br />Site Plan <br />Figure 2: <br />StOCk1OD Kqet[OpD|itGD Airport Height Limit Zoning Plan <br />Figure 3: <br />Pre -Landfill Topography <br />Figure 4: <br />ISOhy8t8|M8p <br />Figure 5: <br />Wind Rose <br />Figure 6: <br />Regional Geology <br />Figure 7: <br />Flood Plain Map <br />Figure 8: <br />Water Quality Monitoring Points LOCDtiOD K8BD <br />Figure 9: <br />Waste Management Unit Layout <br />Figure 10: <br />Landfill Gas Monitoring Probes LOCD1iOD Plan <br />