Laserfiche WebLink
STANDARD PROVISIONS AND REPORTING REQUIREMENTS, JANUARY 2012 -14- <br />FOR <br />14 - <br />FOR WASTE DISCHARGE REQUIREMENTS <br />FOR DISCHARGES REGULATED BY SUBTITLE D AND/OR TITLE 27 <br />structures, and monitoring facilities can be determined throughout the <br />post -closure maintenance period [Title 27, § 20950(d)]. <br />19. Following closure of any MSW landfill units, the Discharger shall notify the <br />Executive Officer that the deed to the landfill facility property, or some other <br />instrument that is normally examined during a title search, has been recorded <br />and a copy placed in the operating record. The notation on the deed shall in <br />perpetuity notify any potential purchaser of the property that the land has been <br />used as a landfill facility and that use of the land is restricted to the planned use <br />described in the post -closure maintenance plan [Title 27, § 20515(a)(4) and <br />§21170, and 40 C.F.R. § 258.60(i)]. <br />20. Construction or repair of the final cover system's low -hydraulic conductivity layer <br />is to be carried out in accordance with an approved construction quality <br />assurance plan [Title 27, § 21090(b)(1)(E)]. <br />21. The Discharger shall incorporate into the closure and post -closure maintenance <br />plan a cover -integrity monitoring and maintenance program which includes at <br />least the following: a periodic leak search, periodic identification of other <br />problem areas, prompt cover repair, and vegetation maintenance <br />[Title 27, § 21090(a)(4)]. <br />22. The Discharger shall complete a final cover survey upon completion of closure <br />activities for that portion of the landfill. The final cover surveys shall include an <br />initial survey and map [Title 27, § 21090(e)(1). Every five years, the Discharger <br />shall conduct a survey of the closed landfill cover and submit an iso -settlement <br />map accurately depicting the estimated total change in elevation of each portion <br />of the final cover's low -hydraulic -conductivity layer [Title 27, § 21090(e)(2)]. <br />23. Within 30 days of completion of all closure activities, the Discharger shall certify <br />that all closure activities were performed in accordance with the most recently <br />approved final closure plan and CQA Plan, and in accordance with all applicable <br />regulations. The Discharger shall also certify that closed landfill units shall be <br />maintained in accordance with and approved post -closure maintenance plan <br />[Title 27, § 21710(c)(6)]. <br />24. Within 180 days of completion of closure construction activities, the Discharger <br />shall submit final documentation of closure, including the Certification of <br />Closure. The closure documents shall include a final construction quality <br />assurance report and any other documents necessary to support the <br />certification [Title 27, § 21880]. <br />25.The post -closure maintenance period shall continue until the Central Valley <br />Water Board determines that wastes remaining in the landfill unit(s) no longer <br />41 pose a threat to water quality [Title 27, § 20950(a)(1)]. <br />