Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES,INC. <br /> (209)847-8757(OFFICE)-(209)847-3700(FAX)•dellechl ra)pacbell.net(Email) <br /> SITE: FORWARD LANDFILL/MANTECA,CA. <br /> GROUNDWATER TREATMENT SYSTEM MONITORING LOG 1015 <br /> 7 DOWNTIME LOG <br /> TOWER PUMPING <br /> OPERATIONAL SYSTEM 4or <br /> DATE STATUS NAME ACTIONS/REASON FOR DOWNTIME <br /> Janus 14,2015 ALL PUMPS RUNNING ALL PUMPS OPERATIONAL/ONLINE RUNING <br /> January29,2015 ALL PUMPS RUNNING ALL PUMPS OPERATIONAL/ONLINE RUMNG <br /> PS OPERATIONAL;EW-3R OFF LINE APPEARS TO FIA VE BEENA <br /> FAILURE.RESET MAIN PANEL AND PUMP CAME BACK ON-LINE- <br /> Februa 10,2015 O\-I.I\I[ NOT ALL PUMPS RUNNING NO PROBLEMS. <br /> February26,2015 ON-LINE ALL PUMPS RUNNING ALL PUMPS OPERATIONAL.ONLINE RUNING <br /> March 20,2015 ON-LINE ALL PUMPS RUNNING <br /> March 30,2015 OFFLINE POWER OFF-NO PUMPS RUNNING NOPOWERTOANYPLNM OR TOWERNOPUMPS RUNNING. <br /> April 8,2015 OFFLIN POWER OFF-NO PUMPS RUNNING PUMPSOFF-LINE RESETANDNOW RUNNING. <br /> April 22,2015 ON-LINE - EW-2 TRIPPED BREAKER:RESET <br /> Me 12,2015 L PUMPS RUNNING-.EXCEPT EW-2 PUMP MOTOR CONTROL FAILED/NEEDS REPLACED <br /> a <br /> M8 26,2015 EW-2 PUMP MOTOR CONTROL,FAILED,PUMP ON ORDER <br /> M8 26,2015 MAINTENANCE CREW BROKE MAIN EFFLUENT LIN' <br /> June 16,2015 ON-LINE LL PUMPS RUNNING MULTIPLE POWER FAILURES <br /> June 24,2015 PUMPS RUNNING <br /> EW-2 POW&MOTOR SCBEDULED FOR REPLACEMENT WEEK OF 7,01/15 <br /> Jul 8,2015 N-LINE L PUMPS RUNNING-EXCEPTT EW-I Puam FAaED-NO MFAsuRAIFE Flow. <br /> July 29,2015r011.,'- <br /> L PUMPS RUNNING-EXCEPT EW-3 EW-3 PUMP MOTOR HAS NOW FAILED-NEW PUMP ON ORDER. <br /> August 5,2015EW-3 STILL DOWN NEW PUMP ASSEMBLY IFAS COME IN-INSTALLING LATER THIS WEEK <br /> August 12,2015 ALL PUMPS RUNNING <br /> August 28,2015 ALL PUMPS RUNNING <br /> Se tember 18,2015 ALL PUMPS RUNNING <br /> Se tember 27,2015 ALL PUMPS RUNNING <br /> October 5,2015 ON-LINE: ALL PUMPS RUNNING <br /> October 29,2015 .-ON-LINES,; ALL PUMPS RUNNING <br /> 3/30/15-P.G.&E.POWER LOSS-RESET MAIN BEAKERS AND SYSTEM BACK ON-LINE. <br /> 4/8/15- MAIN POWER DOWN AGAIN-RESET MAIN POWER PANELS-BACK ON-LINE. <br /> 4/22/15- SYSTEM IS RUNNING - EXTRACTION WELL#2 MAIN BREAKER TRIPPED. RESET BREAKER AND SEEMS FINE-BACKON-LINE PUMPING. <br /> 6/16/15- EXTRACTION WELL 1112 IS DOWN AND WAITING FOR THE PUMP&MOTOR ASSEMBLY. DUE TO THE DROUGHT THESE PARTS ARE ON BACK ORDER <br /> FROM THE GRUNDFOS PLANT IN FRESNO,CA. <br /> 7/6/15 - RECEIVED THE NEW PUMP&MOTOR FROM GRUNDFOS PUMPS-SPECIAL ORDER!!! <br /> 7/17/15- STARTED WELL REPAIRS ON EW-2. COMPLETED REPAIRS ON EW-2 ON 7/18/15. <br /> 7/21/15-ADDITIONAL PIPING REPAIRS TO THE EW-2 PIPING. <br /> 7/21/15- REMOVAL OF THE ABANDONED PUMP SYSTEM IN EW-3. CAPPED OFF TOP OF WELL FOR FUTURE GROUTING&ABANDONMENT. <br /> 7/21/15-ADDITIONAL PIPING REPAIRS NEEDED TO THE EW-2 PIPING DUE TO INCREASED PRESSURE WITH NEW PUMP ASSEMBLY. <br /> 7/21/15- REMOVAL OF EW-1 PUMPING SYSTEM. THIS WELL WAS PUMPING AT 5 GPM AT 5 TO 10 PSI. DOWN HOLE 3"PIPING WAS VERY CORRODED AND <br /> REQUIRED NEW PIPE REPLACEMENT. ALSO THE PUMP UNIT WAS FULL ENCASED WITH A BLACK CALCIUM/BACTERIA COATING. THIS WAS PREVENTING <br /> ANY WATER FROM ENTRING THE PUMP UNIT. <br /> 7/25/15- FULLY DISASSEBLED EW-1 PUMP UNIT-STEAM CLEANED THE WHOLE ASSEMBLY AND REASSEMBLED. INSTALLED THE CLEANED PUMP UNIT WITH <br /> NEW SECTIONS OF 3"GALVANIZED STEEL PIPING. TESTED PUMP AND IT PERFORMED EXCELLENTLY AT 100 GPM AT 60 PSI. EW-1 BACK ON-LINE I! <br /> 7/27/15- EW-3R HAS FAILED. THE PUMP UNIT TRIPS THE MOTOR CONTROL CONTINUOUSLY, AMPERAGE MEASURED ON THE MOTOR LEADS ARE DOUBLE THE <br /> RATED CURRENT FOR THIS MOTOR. MOTOR HAS SHORTED OUT. NEW UNIT IS ON ORDER. <br />