Laserfiche WebLink
22 <br />DEL -TECH GEOTECHNICAL SUPPORT SERVICES, INC. <br />(209) 847-8757 (OFFICE) • (209) 847-3700 (FAX) ` deltech I.kpacbell.nel (Email) <br />SITE: FORWARD LANDFILL / MANTECA, CA. <br />GROUNDWATER TREATMENT SYSTEM MONITORING LOG 2015 <br />DOWNTIME LOG <br />UAl-E <br />SIAIUS <br />NAME <br />OFFLINE ONLINE ACTIONS/ REASON FOR DOWNTIME <br />- LINE <br />EW.2 TRIPPED BREAKER ! RESET <br />May 12, 2015 <br />JALL PUMPS RUNNING - EXCEPT <br />January 14, 2015 <br />May 26,2015 <br />ALL PUMPS RUNNING <br />ALL PUMPS OPERATIONAL /ONLINE RU7JOJG <br />January 29, 2015 <br />- LINE <br />ALL PUMPS RUNNING <br />ALL PUMPS OPERATIONAL /ONLINIi RUNRJG <br />LNEIALL PUMPS RUNNING -EXCEPT '. <br />MULIPLEPOWER FAILURES <br />June24,2015 <br />LL PUMPS OPERATIONAL EW-3ROFFLINE APPEARSTOFMVEBEENA <br />POWER FAILURE. RESET MAIN PANEL AND PUMP CAME BACK ON-LINE - <br />Februa 10, 2015 <br />ON - LUNE <br />NOT ALL PUMPS RUNNING <br />NO PROBLEMS. <br />Februa 26, 2015 <br />EW -3 PUMP MOTOR HAS NOW FARED -NEW PUMP ON ORDER. <br />ALL PUMPS RUNNING <br />ALLPunms OPE RATIONAL /ONLINE RUNINc <br />March 20, 2015 <br />ON-. <br />ALL PUMPS RUNNING <br />March 30.2015 <br />9 O <br />POWER OFF -NO PUMPS RUNNING <br />NOPOWER TOANY PUMPS OR TOWER -140 RAM WIM MO. <br />A rll is, LVIJ <br />w Vrr LIIV PUWCKUth-NUPUMFh KUNNINU <br />PUMPS OFF-LINE; RESET AND NOW RUNNING. <br />April 22, 2015 <br />- LINE <br />EW.2 TRIPPED BREAKER ! RESET <br />May 12, 2015 <br />JALL PUMPS RUNNING - EXCEPT <br />EW -2 PUMP MOTOR CONTROL. FAILED_ NEEDS REPLACED <br />May 26,2015 <br />- LINE <br />EW -2 PUMP MOTOR CONTROL FAMED PUMP ON ORDER <br />Me 26, 2015 <br />- LINE <br />MAINTENANCE CREW BROKE. MAIN EFFLUENTLINE <br />June 16, 2015 <br />LNEIALL PUMPS RUNNING -EXCEPT '. <br />MULIPLEPOWER FAILURES <br />June24,2015 <br />EW -2 PUMP & MOTOR SCfffDULED FOR REPLACEMENT WEEK OF 7/01/15 <br />Jul 8, 2015 <br />L PUMPS RUNNING - EX <br />EWA FAILED -NO MEASURABLE FLOW, <br />July 29, 2015 <br />`° ALL PUMPS RUNNING - EXCEPT" 8W- <br />EW -3 PUMP MOTOR HAS NOW FARED -NEW PUMP ON ORDER. <br />August 5.2015 <br />E\V - 3 STILL DOWN <br />NE1V PtIMPASSEMBLY HAS CAME IN - INSTALIJM LATER THIS WEEK <br />September 18, 2015fON <br />ON - LINE <br />ALL PUMPS RUNNING <br />September 27, 2015 <br />- LINE <br />ALL PUMPS RUNNINGOctober <br />5, 2015ON <br />- LINE <br />ALL PUMPS RUNNINGOctober <br />29, 2015ON <br />- LINE <br />ALL PL NIPS RUNNING <br />November 19,2015ON <br />- LINE <br />ALL PUMPS RUNNING <br />November 30. 2015ON <br />- LINE <br />ALL PUMPS RUNNING ,. <br />- RESET MAIN BEAKERS AND SYSTEM BACK ON-LINE. <br />7/21/15 - ADDITIONAL PIPING REPAIRS TO THE EW -2 PIPING. <br />7/21/15 - REMOVAL OF THE ABANDONED PUMP SYSTEM IN EW - 3. CAPPED OFF TOP OF WELL FOR FUTURE GROUTING 8 ABANDONMENT. <br />7/21/15 - ADDITIONAL PIPING REPAIRS NEEDED TO THE EW -2 PIPING DUE TO INCREASED PRESSURE WITH NEW PUMP ASSEMBLY. <br />7/71/15 _ RFM(1VAI r1F FM/_1 DI IAADI M(_ CVCTPU THIO MIDI I MIA DI I\ADI AIr_ AT S (_DSA AT A Tn in DCI MMIAI WMI DI DIKr MIA \/COV (`l1D Dllr M AKIM <br />• <br />0 <br />0 <br />