Laserfiche WebLink
OEL�ELH <br />DEL TECH GEOTECHNICAL SUPPORT SERVICES, INC. <br />• (209) 8474737 (OFFICE) • (209) 847-3700 (FA)) deltechl@pacbel.net (Email) <br />SITE: FORWARD LANDFILL / MANTECA, CA. <br />GROUNDWATER TREATMENT SYSTEMMONITOWNG LOG 2015 <br />DOWNTIME LOG <br />TOWER PUMPING <br />OPERATIONAL SYSTEM TIME TIRE <br />DATE STATUS NAME OFFLINE ONLINE ACTIONS / REASON FOR DOWNTIME <br />......................................... <br />January 14,2015 ALL PUMPS RUNNING ALL PUMPS OPERATIONAL/ONIJNE RUNBNG <br />January29,2015 ALL PUMPS RUNNING ALL PUMPS OPERATIONAL /ONIdNE RUNING <br />PUMPS OPERATIONAL/ EW-3R OFF LINE / APPEARS TO HAVE <br />• .. A POWER FAH.URE. RESET MAIN PANEL AND PUMP CAME BACK ON- <br />Febrna 10, 2015 ON - LINE NOT ALL PUMPS RUNNING LINE - NO PROBLEMS. <br />February26, 2015 ON - LINE ALL PUMPS RUNNING <br />March 20 2015 ON - LINE ALL PUMPS RUNNING <br />March 30 2015 OFFLINE POWER OFF-NO PUMPS RUNNING NO POWERTO ANY PUMPS ORTOWER NO PUMPS RUNNING. <br />April 2015 OFFLINE POWER OFF-NO PUMPS RUNNING PUMPS OFF -LINE / RESET AND NOW RUNNING. <br />April 22 2015 ON - LINE . . " S RUNNING- EXCEPT EW- TRIPPED RIPPED BREAKER / RESET <br />May 12 2015 ON - LINE ALL PUMPS RUNNING - EXCEPT EW- EW-2 PUMP MOTOR CONTROL FAILED / NEEDS REPLACED <br />May 26, 2015 ON - LINE ALL PUMPS RUNNING - EXCEPT EW- EW-2 PUMP MOTOR CONTROL FARM / PUMP ON ORDER <br />May 26,2015 OFFLINE SYSTEM DOWN MAINTENANCE CREW BROKE MAIN EFFLUENT LINE <br />June 16,2015 ON - LINE ALL PUMPS RUNNING - EXCEPT EW-2 MULTIPLE POWER FAILURES <br />June 24, 2015 ON - LINE ALL PUMPS RUNNING - EXCEPT EW- EW-2 PUMP & MOTOR SCHEDULED FOR REPLACEMENT WEEK <br />OF 7/01/15 <br />JWy 8, 2015 ON - LINE ALL PUMPS RUNNING - EXCEPT EW-1 EW-1 PUMP FAILED - NO MEASURABLE FLOW. <br />July 29, 2015 ON - LINE ALL PUMPS RUNNING - EXCEPT EW- EW-3 PUMP MOTOR HAS NOW FAILED - NEW PUMP ONO. <br />NEW PUMP ASSEMBLY <br />August 5, 2015 OFFLINE EW - 3 STILL DOWN WEEK <br />August 12, 2015 ON - LINE ALL PUMPS RUNNING ,., NEW PUMFMOTOR INSTALLED:INEW-3R <br />August 28, 2015 ON - LINE ALL PUMPS RUNNING <br />September 1S, 2015 ++ ON - LINE ALL PUMPS RUNNING <br />SqUember 27, 2015 ON - LINE ALL PUMPS RUNNING <br />October 5, 2015 ON - LINE ALL PUMPS RUNNING <br />October 29, 2015 ON - LINE ALL PUMPS RUNNING <br />November 19, 2015 ON - LINE ALL PUMPS RUNNING <br />November 30, 2015 ON - LINE ALL PUMPS RUNNING <br />December 9, 2015 ON - LINE ALL PUMPS RUNNING <br />December 22, 2015 ON - LINE ALL PUMPS RUNNING EW-2 TOTAL12ER WAS STUCK NOT TURNING <br />CLEANED TOTALIZER AND IT IS TURNING AGAIN !! <br />3/30/15 - P.G.&E. POWER LOSS - RESET MAIN BEAKERS AND SYSTEM BACK ON UNE. <br />4/6/15 - MAIN POWER DOWN AGAIN - RESET MAIN POWER PANELS - BACK ON-LINE. <br />4/22115 - SYSTEM IS RUNNING - EXTRACTION WELL # 2 MAIN BREAKER TRIPPED. RESET BREAKER AND SEEMS FINE - BACK ON-LINE PUMPING. <br />6/16/15 - EXTRACTION WELL # 21S DOWN AND WAITING FOR THE PUMP & MOTOR ASSEMBLY. DUE TO THE DROUGHT THESE PARTS ARE ON BACK ORDER <br />FROM THE GRUNDFOS PLANT IN FRESNO, CA. <br />7/6/15 - RECEIVED THE NEW PUMP & MOTOR FROM GRUNDFOS PUMPS - SPECIAL ORDER M <br />7/17/15 - STARTED WELL REPAIRS ON EW-2. COMPLETED REPAIRS ON EW- 2 ON 7/18/15. <br />7/21/15 - ADDITIONAL PIPING REPAIRS TO THE EW-2 PIPING. <br />7/21/15 - REMOVAL OF THE ABANDONED PUMP SYSTEM IN EW - 3. CAPPED OFF TOP OF WELL FOR FUTURE GROUTING & ABANDONMENT. <br />7/21/15 - ADDITIONAL PIPING REPAIRS NEEDED TO THE EW-2 PIPING DUE TO INCREASED PRESSURE WITH NEW PUMP ASSEMBLY. <br />7/21/15 - REMOVAL OF EW-1 PUMPING SYSTEM. THIS WELL WAS PUMPING AT 5 GPM AT 5 TO 10 PSI. DOWN HOLE 3" PIPING WAS VERY CORRODED AND <br />REQUIRED NEW PIPE REPLACEMENT. ALSO THE PUMP UNIT WAS FULL ENCASED WITH A BLACK CALCIUM / BACTERIA COATING. THIS WAS PREVENTING <br />ANY WATER FROM ENTRING THE PUMP UNIT. - <br />7/25/15 - FULLY DISASSEBLED EW-1 PUMP UNIT - STEAM CLEANED THE WHOLE ASSEMBLY AND REASSEMBLED. INSTALLED THE CLEANED PUMP UNIT WITH <br />NEW SECTIONS OF 3" GALVANIZED STEEL PIPING. TESTED PUMP AND IT PERFORMED EXCELLENTLY AT 100 GPM AT 60 PSI. EW-1 BACK ON-LINE !! <br />7/27/15 - EW - 3R HAS FAILED. THE PUMP UNIT TRIPS THE MOTOR CONTROL CONTINUOUSLY. AMPERAGEMEASURED ON THE MOTOR LEADS ARE DOUBLE THE <br />RATED CURRENT FOR THIS MOTOR MOTOR HAS SHORTED OUT. NEW UNIT IS ON ORDER. <br />• <br />• <br />• <br />