Laserfiche WebLink
!V <br />DEL -TECH GEOTECHNICAL SUPPORT SERVICES, INC. <br />(209) 847-5757 (OFFICE) • (209) 547-3700 (FAX) • deltechl(aVacbNLnet (Email) <br />SITE: FORWARD LANDFILL / MANTECA, CA. <br />GROUNDWATER TREATMENT SYSTEM MONITORING LOG 2015 <br />DOWNTIME LOC <br />TOWER PUMPING <br />OPERATIONAL SYSTEM TIME TTME <br />DATE <br />January 14.2015 <br />STATUS NAME OFFLINE ONLINE <br />ALL PUMPS RUNNING <br />ACTIONS / REASON FOR DOWNTIME <br />ALLPUMFSOPERATK)NAL/ONLNERUNING <br />Jan 29,2015 <br />ALL PUMPS RUNNING <br />ALL PUMPS OPERATIONAL/ONLINE RUNING <br />February � 1%2015 <br />ON-LINE NOT ALL PUMPS RUNNING <br />ALL PLMPS OPERATKINAL I EWJROFF LINE/ APPEARS TO HAVE BEEN <br />WEN FAEAIRE RESET NACU PAN EL AND PUMP CAME BACK ON-LINE - NO <br />PROBLEMS. <br />Fe 26,2015 <br />ALL PUMPS RUNNING <br />ALL PUMPS OPERATIONAL/ONLNE RUNING <br />March 20, 2015 <br />ALL PUMPS RUNNING <br />March A 2015 <br />POWER OFF -NO PUMPS RUNNING <br />NO POWERTO ANY PU►IPSSORTOWER. NO PUMPS RUNNING. <br />April 8,2015 <br />POWER OFF -NO PUMPS RUNNING <br />PUMPS OFF-LINE/ RESET AND NOW RUNNNG. <br />April 22, 2015 <br />LL PUMPS RUNNING - EXCEPT EW- <br />EW -2 TRIPPED BREAKER / RESET <br />May 12, 2015 <br />L PUMPS RUNNING - EXCEPT EW -2 EW-2 <br />EW.2 PUMP MOTOR CONTROL FAILED / NEEDS REPLACED <br />May 26.2015 <br />LL PUMPS RUNNING -EXCEPT EW- <br />EW -2 PUMPMOTOR CONTROL FAILED I PUMP ON ORDER <br />May 26,2015 <br />SYSTEM DOWN <br />A FLARE MAINTENANCE CREW BROKE THE MAIN TOWER EFFLUENT 6•PVC <br />WATER LINE ON THE NORHT SIDE OF THE COMPOUND BY ACCIDENTLY <br />DRNING OVER FF WITH A LARGE MANLIFf ON 5/26/15. DELTECH <br />EXCAVATED AND REPAIRED THE EFFLUENT LINE ON 5/28/15 ONLY TO <br />DISCOVER THAT WHEN BRING THE GROUNDWATER TREATMENT SYSTEM <br />BACKON-LINE THAT THEY HAD ALSO DRIVEN OVER AND CRACKED THE <br />INMUENT LINE ON THE SOUTHERN SIDE OF THE COMPOUND. DELTECH <br />ORDERED PARTS AND RETURNED ON 6/01/15 AND EXCAVTED AND <br />COMPLETED THE INFLUENT LNE REPAIRS. ALL PIPING REPAIRS ARE NOW <br />COMPLETE. <br />June 16, 2015 <br />LL PUMPS RUNNING - EXCEPT EW -2 <br />MULTBLEPOWER PAH.URES <br />June 24,2015 <br />kLL PUMPSRUNNING-EXCEPT EW -2 <br />MAY 15 -EW -2 PUMP& MOTOR WAS ORDERED FROM GRUNDFOS. GUSTO <br />THE HEAVY PUMP DEMANDS FOR SUPPLIES DURING THE CURRENT <br />CALDaDRNIA DROUGHT- THE CURRENT DE SV ERY TURNAROUND TIME <br />FOR NEW PUMPS IS - 5 TO 6 WEEKS. THE CURRENT SCHEDULED REPAIRS <br />FOR EW -2 ARE SCHEDULED FOR THE WEEKOF 7/05115. <br />3/30/15 - P.G.BE. POWER LOSS - RESET MAIN BEAKERS AND SYSTEM BACK ON-LINE. <br />4/8115 - MAIN POWER DOWN AGAIN - RESET MAIN POWER PANELS - BACK ON-LINE. <br />4/22115 - SYSTEM IS RUNNING - EXTRACTION WELL # 2 MAIN BREAKER TRIPPED. RESET BREAKER AND SEEMS FINE - BACK ON-LINE PUMPING. <br />• <br />C <br />0 <br />