Laserfiche WebLink
C <br />QEL.-TEC hi <br />DEL -TECH GEOTECHNICAL SUPPORT SERVICES, INC. <br />- (209) 847-8757 (OFFICE) * (209) 847-3700 (FAX) * deltechlCpacbell.net (Email) <br />SITE: FORWARD LANDFILL / MANTECA, CA. <br />GROUNDWATER TREATMENT SYSTEMMONITORING LOG 2075 <br />DOWNTIMELOG <br />TOWER PUMPING <br />OPERATIONAL SYSTEM TIME TIME <br />DATE STATUS NAME OFFLINE ONLINE ACTIONS/ REASON FOR DOWNTIME <br />Janus 14, 2015 ALL PUMPS RUNNING ALL PUMPS OPERATIONAL/ONf.NE RUINING <br />Janus 29, 2015 ALL PUMPS RUNNING ALI. PUMPS OPERATIONAL /ONLNERUNING <br />ALL PUMPS OPERA TTONAL/ EW -3R OFF LINE / APPEARS TO HAVE BEEN <br />POWER FAILURE. RESET MAN PANEL AND POW CAME BACK ON-LNE - <br />Februa 10, 2015 NOT ALL PUMPS RUNNING NO PROBLEMS. <br />February26,201$ ALL PUMPS RUNNING ALL PUMPS OPERATIONAL /ONLINE RUINING <br />March 20, 2015 ALL PUMPS RUNNING <br />March 30, 2015 POWER OFF -NO PUMPS RUNNING NO POWER TO ANY PUMPS OR TOWER. NO PUMPS RUNNING. <br />April 8, 2015 POWER OFF -NO PUMPS RUNNING PUMPS OFF-LINE / RESET AND NOW RUNNING. <br />!ON <br />Aril 22, 2015 L[NE ALL PUMPS RUNNA]G - EXCEPT EW -2 ew--2 TRIPP®BREAKER /RESET <br />Ma 12,2015 LINE ALL PUMPS RUNNING - EXCEPT EW -2 EW -2 PUMP MOTOR CONTROL FARM / NEEDS REPLACED <br />Ma 26, 2015 LINE LL PUMPS RUNNING - EXCEPT EW- Ew-2 PUMP MOTOR CONTROL FAILED / PUMP ON ORDER <br />Me 26, 2015 LINE. SYSTEM DG MAINTENANCE CREW BROKE MAN EFFLUENT LINE <br />June 16,2015 -.,:--- LL PUMPS RUNNING - EXCEPT EW -2 MULTIPLE POWER FAILURES <br />June 24, 2015 11111oft-_,L PUMPS RUNNING - EXCEPT EW -2 <br />EW -2 PUMP & MOTOR SCHEDULED FOR REPLACEMENT WEEK OF 7/01/15 <br />July 8, 2015 PS RUNNING - EXCEPT EW -I EW -1 PUMP FAILED -NO MEASURABLE FLOW. <br />July 29, 201$ - ON -LINE ALL PUMPS RUNNING - EXCEPT EW -3 EW -3 PUMP MOTOR HAS NOW FAILED - NEW PIMP ON ORDER. <br />August 5, 2015 'OFFLINE EW - 3 STILL DOWN NEW PUMP ASSEMBLY HAS COME IN - INSTALLING IATER THIS WE IC <br />August 12, 2015 ON- LINE ALL PUMPS RUNNING <br />August 28, 2015 - E ALL PUMPS RUNNING <br />September 18, 2015 ALL PUMPS RUNNING <br />September 27, 2015 ALL PUMPS RUNNING <br />3/30/15 - P.G.&E. POWER LOSS - RESET MAIN BEAKERS AND SYSTEM BACK ON-LINE. <br />4/8/15 - MAIN POWER DOWN AGAIN - RESET MAIN POWER PANELS - BACK ON-LINE. <br />4/22/15 - SYSTEM IS RUNNING - EXTRACTION WELL # 2 MAIN BREAKER TRIPPED. RESET BREAKER AND SEEMS FINE - BACK ON-LINE PUMPING. <br />6/16/15 - EXTRACTION WELL # 2 IS DOWN AND WAITING FOR THE PUMP & MOTOR ASSEMBLY. DUE TO THE DROUGHT THESE PARTS ARE ON BACK ORDER <br />FROM THE GRUNDFOS PLANT IN FRESNO, CA. <br />7/6/15 - RECEIVED THE NEW PUMP & MOTOR FROM GRUNDFOS PUMPS - SPECIAL ORDER III <br />7/17/15 - STARTED WELL REPAIRS ON EW -2. COMPLETED REPAIRS ON EW -2 ON 7/18/15. <br />7/21/15 - ADDITIONAL PIPING REPAIRS TO THE EW -2 PIPING. <br />7/21/15 - REMOVAL OF THE ABANDONED PUMP SYSTEM IN EW - 3. CAPPED OFF TOP OF WELL FOR FUTURE GROUTING & ABANDONMENT. <br />7/21/15 - ADDITIONAL PIPING REPAIRS NEEDED TO THE EW -2 PIPING DUE TO INCREASED PRESSURE WITH NEW PUMP ASSEMBLY. <br />7/21/15 - REMOVAL OF EW -1 PUMPING SYSTEM. THIS WELL WAS PUMPING AT 5 GPM AT 5 TO 10 PSI. DOWN HOLE 3" PIPING WAS VERY CORRODED AND <br />REQUIRED NEW PIPE REPLACEMENT. ALSO THE PUMP UNIT WAS FULL ENCASED WITH A BLACK CALCIUM / BACTERIA COATING. THIS WAS PREVENTING <br />ANY WATER FROM ENTRING THE PUMP UNIT. <br />7/25/15 - FULLY DISASSEBLED EW -1 PUMP UNIT - STEAM CLEANED THE WHOLE ASSEMBLY AND REASSEMBLED. INSTALLED THE CLEANED PUMP UNIT WITH <br />NEW SECTIONS OF 3" GALVANIZED STEEL PIPING. TESTED PUMP AND IT PERFORMED EXCELLENTLY AT 100 GPM AT 60 PSI. EW -1 BACK ON-LINE lI <br />7/27/15 - EW - 3R HAS FAILED. THE PUMP UNIT TRIPS THE MOTOR CONTROL CONTINUOUSLY. AMPERAGEMEASURED ON THE MOTOR LEADS ARE DOUBLE THE <br />RATED CURRENT FOR THIS MOTOR. MOTOR HAS SHORTED OUT. NEW UNIT IS ON ORDER. <br />