Laserfiche WebLink
Quarterly Progress Report — Third Quarter 2015 <br />Austin Unit. Forward Landfill Page 2 <br />term "remedial system". Forward, Inc. interprets the term to include the groundwater extraction and <br />treatment system, along with the landfill gas collection and destruction system. Landfill gas collection <br />and destruction provides source control. Groundwater extraction and treatment provides remediation to <br />impacted groundwater. Information relevant to each of the remediation systems is provided below. As <br />described in the CAO, the evaluation of individual extraction points applies to both groundwater and <br />landfill gas extraction points. <br />Groundwater Extraction and Treatment System <br />The groundwater extraction and treatment system includes four groundwater recovery wells (EW -1, <br />EW -2, EW -3R and EW -4), an above -ground air stripper system, and an infiltration basin located north <br />of the landfill. Each of these components was previously approved by the RWQCB. <br />Del -Tech Geotechnical Support Services, Inc. (Del -Tech) performed operations and maintenance on <br />the groundwater extraction and treatment system during the period of July 1 through September 30, <br />2015. The system monitoring logs from Del -Tech for the third quarter 2015 are attached. <br />Del -Tech records indicate that the groundwater extraction and treatment system experienced the <br />following maintenance issues and/or periods of downtime during the third quarter 2015: <br />• July 8, 2015: Recovery well EW -2 was offline due to an apparent failed pump motor. This <br />issue had first been observed on June 16, 2015. Maintenance was completed on EW -2 and the <br />well was restored to operation on July 18, 2015. <br />• July 21, 2015: It was observed that recovery well EW -1 had a pump encrusted with <br />precipitates / deposits that were inhibiting uptake of groundwater. The well was disassembled, <br />cleaned, and reassembled by Del -Tech and restored to operation on July 25, 2015. <br />• July 27, 2015: It was observed that recovery well EW -3R was offline due to a failed pump <br />motor. Maintenance was completed on EW -3R and the well was restored to operation on <br />August 12, 2015. <br />Based on analytical laboratory testing results from April 8, 2015, the influent to the groundwater <br />treatment system contained 9.68 ug/L of VOCs. Based on totalizing flow meter readings from Del - <br />Tech, an estimated 15.9 million gallons of extracted groundwater were treated during the third quarter <br />2015, yielding approximately 1.29 pounds of VOCs removed during this period. <br />There were no VOCs detected above their reporting limits (RLs) in the most recent treatment system <br />effluent sample for which results are available, collected on June 16, 2015. <br />Landfill Gas Collection and Destruction System <br />The landfill gas collection and destruction system servicing the Austin Road Unit at the Forward <br />Landfill consists of 107 landfill gas extraction wells, according to the 2015 GCCS Improvements Plans <br />prepared by Cornerstone Environmental. Collected landfill gas is routed to Flare A-2 for thermal <br />destruction, with Flare A-1 serving as a back-up flare. On a weekly basis SCS Field Services records <br />information such as methane gas concentration (percent by volume), oxygen concentration (percent by <br />volume), carbon dioxide concentration (percent by volume), balance gas (percent by volume), flow rate 0 <br />