Laserfiche WebLink
n <br />TABLE 6 <br />FORWARD LANDFILL <br />CLOSURE COST ESTIMATE SUMMARY <br />STAGE IA PARTIAL CLOSURE AREA <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNIT PRICE <br />ESTIMATED COST <br />($) <br />11 <br />ENGINEERING DESIGN (4) <br />1 Is <br />$85,000 <br />$85,000 <br />Subtotal <br />Subtotal $73,692 <br />Total Construction Cost $2,107,483 <br />Contingency 20% $421,497 <br />Total Closure Cost Estimate $2,528,980 <br />Notes: <br />(1) Costs for preparation and compaction of the existing one foot of foundation is included in this item. <br />(2) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one <br />foot of soil would already be in place. <br />(3) No cost is included in this category because the system is currently in-place and/or no modification is required <br />as part of the Stage IA partial closure. <br />(4) Cost is for engineering design and preparation of construction documentation (plans and specifications) for <br />bid purposes. <br />(5) Cost is for monitoring contractors work, coordinating CQA activities, meetings, liaison between design <br />engineers and contractors, etc. <br />Forward Landfill PCPCMPR <br />J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\ClosCst.XLS; Revision 1: 6/14/2005 <br />Page 2 of 2 <br />