Laserfiche WebLink
w <br />TITLE SHEET <br />�.; <br />Alk- <br />SAN <br />JOAQUIN <br />• CALIFORNIA <br />sTo��r <br />�N <br />M�RoAO 00 Cl <br />Q <br />/Tq NORTHERN CALIFORNIA 6 <br />Oa D Q/,Qp YOUTH CENTER z <br />PROJECT 0 D <br />LOCATION <br />BASE LINE ROAD <br />E JOHN <br />Gy�p�L NORTH FORK OF SOUTH L��� <br />dpi SOUTH FoR <br />0 SpUT <br />£ JOHNS REEK <br />LONE TR <br />FF <br />FA?8 cgMp CRFF/r <br />99 <br />0 <br />o: <br />N Z <br />a <br />LOCATION MAP <br />N,T.S, <br />NO. REVISION DESCRIPTION BY: <br />UAIE <br />BRYAN A. STIRRAT & ASSOCIATES <br />CONSULTING CIVIL & ENVIRONMENTAL ENGINEERS <br />1360 E. VALLEY VISTA DRIVE <br />DIAMOND BAR, CALIFORNIA 91765 <br />(909) 860-7777 <br />INDEX OF SHEETS <br />1 <br />TITLE SHEET <br />2 <br />SITE AND INDEX MAP <br />3 <br />CLOSURE GRADING PLAN <br />4 <br />CLOSURE GRADING .PLAN <br />5 <br />CLOSURE GRADING PLAN <br />6 <br />CLOSURE GRADING PLAN <br />7 <br />CLOSURE GRADING PLAN <br />8 <br />SEEP MITIGATION PLAN <br />9 <br />EROSION CONTROL PLAN : <br />D-1 <br />DETAIL SHEET <br />D-2 <br />DETAIL SHEET <br />D-3 <br />DETAIL SHEET <br />D-4 <br />DETAIL SHEET <br />G1 <br />GAS SYSTEM REMOVAL PLAN <br />G2 <br />GAS SYSTEM REMOVAL PLAN <br />G3 <br />GAS SYSTEM REMOVAL PLAN <br />G4 <br />GAS SYSTEM REMOVAL PLAN <br />G5 <br />GAS SYSTEM REMOVAL PLAN <br />G6 <br />FINAL GAS SYSTEM PLAN <br />G7 <br />FINAL GAS SYSTEM PLAN <br />G8 <br />FINAL GAS SYSTEM PLAN <br />G9 <br />FINAL GAS SYSTEM PLAN <br />G10 <br />GAS SYSTEM DETAILS <br />G11 <br />GAS SYSTEM DETAILS <br />G12 <br />GAS SYSTEM DETAILS <br />G13 <br />GAS SYSTEM DETAILS <br />FORWARD <br />LANDFILL <br />TITLE SHEET <br />STAGE <br />IA PARTIAL <br />FINAL CLOSURE CONSTRUCTION PLANS <br />DESIGNED BY <br />R.M.G. <br />SCALE <br />AS SHOWN <br />DRAWN BY : <br />M.T.B./C..A.L. <br />DATE <br />06-05 FILE NO.: 01 299D <br />CHECKED BY <br />R.M.G. <br />GATE <br />06-05 <br />APPROVED BY <br />B.A.S. <br />DATE <br />06-05 SHEET 1 OF 26 <br />