Laserfiche WebLink
Geo -Logic <br />A S S O C I AT E SV <br />• <br />Geologists, Hydrogeologists and Engineers <br />April 13, 2016 <br />J N : 2016-0007 <br />Mr. Brendan Kenny <br />Central Valley Regional Water Quality Control Board <br />11020 Sun Center Drive, Suite 200 <br />Rancho Cordova, CA 95670-6114 <br />QUARTERLY PROGRESS REPORT <br />FIRST QUARTER 2016 <br />AUSTIN ROAD UNIT, FORWARD LANDFILL <br />SAN JOAQUIN, CALIFORNIA <br />Dear Mr. Kenny: <br />On behalf of Forward, Inc. and in accordance with Task 6.a of the December 8, 2008 Cleanup and <br />Abatement Order (CAO) R5-2008-0714 issued by the California Regional Water Quality Control <br />Board (RWQCB), Geo -Logic Associates (GLA) is submitting this Quarterly Progress Report for the <br />Austin Road Unit (ARU) of the Forward Landfill. This Quarterly Progress Report has been prepared <br />to provide the information specified in Task 6.a of the CAO. <br />The information summarized in this Quarterly Progress Report has been compiled from a number of • <br />sources, including Forward, Inc. personnel, consultants responsible for the operation and <br />maintenance (O&M) of the Unit's groundwater extraction and treatment system, and consultants <br />responsible for the 0&M of the facility's landfill gas extraction and destruction system. <br />All Work Completed During Previous Calendar Quarter to Comply with CAO <br />During the period of January 1 through March 31, 2016 the following work was completed to <br />comply with the CAO and other corrective action requirements: <br />➢ The Quarterly Progress Report for the Fourth Quarter 2015 was submitted to the <br />RWQCB on January 14, 2016, in accordance with Task 6.a. of the CAO. <br />Violations of the CAO <br />CAO Task 6.a indicates that Quarterly Progress Reports shall include a description of any violations <br />of the CAO during the relevant quarter. There were no known violations of the CAO during the <br />period of January 1 through March 31, 2016. <br />Remediation System Operations and Performance Evaluation of Individual Extraction Points <br />CAO Task 6.a indicates that Quarterly Progress Reports shall include information on remedial <br />system operation and performance during the relevant quarter. The CAO does not provide a <br />definition of the term "remedial system". Forward, Inc. interprets the term to include the <br />groundwater extraction and treatment system, along with the landfill gas collection and destruction • <br />11415 W. Bernardo Court, Suite 200, San Diego, California • T 858.451.1136 • F 858.451.1087 9 www.geo-logic.com <br />