Laserfiche WebLink
1 <br />t <br />1 <br />a <br />DEL -TECH GEOTECHNICAL SUPPORT SERVICES, INC. <br />(209) 847-8757 (OFFICE) v (209) 847-3700 (FAX) • deltechl@pacbell.net (Email) <br />SITE: FORWARD LANDFILL / MANTECA, CA. <br />GROUNDWATER TREATMENT SYSTEM MOATTORING LOG 2016 <br />DOWNTIME LOG <br />TOWER PUMPING <br />OPERATIONAL SYSTEM TIME TIME <br />DATE STATUS NAME OFFLINE ONLINE <br />ACTIONS / REASON FOR DOWNTIME <br />Janua 13, 2016 EXTRACTION WELLS L2,3R & 4 0:00 <br />ALL WELLS RUNNING <br />January 29, 2016 EXTRACTION WELLS L2,3R & 4 0:00 <br />ALL WELLS RUNNING <br />Februa 9, 2016 EXTRACTION WELLS I AND 2 0:00 <br />ALL WELLS RUNNING <br />February 9, 2016 EXTRACTION WELLS 3R & 4 ?? <br />POWER FAILURE / BREAKERS TRIPPED i RESET BREAKERS AND BOTH <br />UNIT BACK ON-LINE <br />February 29, 2016 EXTRACTION WELLS 1,2 & 4 0:00 <br />THESE WELLS ARE RUNNING <br />February 29, 2016 EXTRACTION WELLS 3R ?? <br />BREAKER WAS TRIPPED AGAIN -- POSSIBLE MOTOR TROUBLES <br />AGAIN <br />March 15, 2016 EXTRACTION WELLS 3R ?? <br />THE PUMP MOTOR HAS FAILED - NEW MOTOR ON ORDER <br />March 15, 2016 EXTRACTION WELLS 1,2 & 4 0:00 <br />THESE WELLS ARE RUNNING <br />March 29, 2016 EXTRACTION WELLS 1,2 & 4 0:00 <br />THFSE WELLS ARE RUNNING <br />March 29,201 EX - 3R <br />NEW MOTOR SCHEDULED FOR INSTALLATION 4/4/16 <br />April 15,2016 ,.,_. EXTRACTION WELLS L2,3R&4 0:00 <br />ALL WELLS RUNNING <br />April 29, 2016 ON-LINE EXTRACTION WELLS 1,2,3R & 4 0:00 <br />ALL WELLS RUNNING <br />May 9, 2016 ON -LIN ...„ EXTRACTION WELLS L2,3R & 4 0:00 <br />ALL WELLS RUNNLNc <br />May 27,2016 ON-LINs EXTRACTION WELLS L2,3R&4 0:00 1 <br />ALL WELLS RUNNING <br />June 13, 2016 ON-LINE: EXTRACTION WELLS 1,2,3R & 4 0:00 <br />ALL WELLS RUNNING <br />June 13,2016 ON-LINE EXTRACTION WELL 2 0:00 <br />TOTALIZER NOT WORKING <br />June 27,2016 ON-LINE EXTRACTION WELLS 1,2,3R&4 0:00 <br />ALL WELLS RUNNING <br />June 27, 2016 ON -LIN EXTRACTION WELL 2 0:00 <br />DISASSEMBLED TOTALIZER AND CLEANED- WORKING NOW <br />July 8, 2016 ON -LIN EXTRACTION WELLS 1,2,3R & 4 0:00 <br />ALL WELLS RUNNING <br />July 18, 2016 - O EXTRACTION WELLS 1 0:00 <br />2" PVC PIPE LINE BROKEN - REPAIRED ON 7-20-2016 <br />July 20, 2016 O ". EXTRACTION WELLS L2,3R & 4 0:00 <br />ALL WELLS RUNNING <br />August 12, 2016 ON -LIN EXTRACTION WELLS 1,2,3R & 4 0:00 <br />Au ust l0, 2016 ON -LIN EXTRACTION WELLS 1,2,3R & 4 0:00 <br />August 31, 2016 EXTRACTION WELLS L2,3R & 4 0:00 <br />September 10, 2016 EXTRACTION WELLS L2,3R & 4 0:00 <br />September 26, 2016 FULL SYSTEM OFF-LINE 4 DAYS <br />September 29, 2016 ON -LI EXTRACTION WELLS 1,2,3R & 4 0:00 <br />ALI, WELLS RUNNING <br />FLAW METERS FORANNUAL CAL <br />ALL WELLS RUNNING <br />ALL WELLS RUNNING <br />ALL WELLS RUNNING / FULL SYSTEM BACK ON-LINE ALL REPAIRS <br />COMPLETE <br />October 14, 2016 ON -LIN EXTRACTION WELLS L2,3R & 4 0:00 <br />ALL WELLS RUNNING I FULL SYSTEM BACK ON-LINE ALL REPAIRS <br />COMPLETE <br />October 31, 2016 EXTRACTION WELLS 1,2,3R & 4 0:00 <br />ALL WELLS RUNNING / FULL SYSTEM BACK ON-LINE ALL REPAIRS <br />COMPLETE <br />November 18, 2016 EXTRACTION WELLS 4 0:00 <br />'IRE MAIN BREAKER HAD TRIPPED - NO REASON COULD BE FOUND. <br />RESET AND BACK ON-LINE. <br />November l8, 2016 EXTRACTION WELLS L2,3R 0:00 <br />November 30, 2016 EXTRACTION WELLS L2,3R & 4 0:00 <br />ALL WELLRUNNING / FULL SYSTEM BACK ON-LINE ALL REPAIRS <br />S COMPLETE <br />ALI- WELLS RUNNING / FULL SYSTEM BACK ON-LINE ALL REPAIRS <br />COMPLETE <br />December 7, 2016 EXTRACTION WELLS L2,3R & 4 0:00 <br />ALL WELLS RUNNING / FULL SYSTEM BACK ON-LINE ALI, REPAIRS <br />COMPLETE <br />f <br />December 22, 2016 EXTRACTION WELLS L2,3R & 4 0:00 <br />ALL WELLS RUNNING i FULL SYSTEM BACK ON-LINE ALL REPAIRS <br />COMPLETE <br />NOTES: <br />WE REMOVEDTHE MCCROMETER FLOW METERS FROM EACH CTION WELL HEAD AND REPLACED THEM WITH A BLANK ON" 0/2016. <br />FLOW METERS HAVE BEEN SHIPPED TO FACTORY FOR CALIBRATION. STANDARD TURNAROUND -:3U DAYS. <br />CALIBRATED FLOW METER HAVE BEEN RE -INSTALLED AND ARE WORKING. <br />THE AIR STRIPPERTOWER WAS CLEANED AND ACID WASHED FOR 16 HOURS OF CYCLING. BACK PRESSURE WAS REDUCED BY 50% - FROM 40.0" TO 23.5" water pres. <br />NEW PRESSURE GAUGES WERE INSTALLED AT WELLHEADS. MISC. PIPING REPAIRS AND NEW GASKETS ON FLANGES ON EW -3. <br />