Laserfiche WebLink
2017 Corrective Action Evaluation Report-Austin Road Unit <br /> Forward Landfill <br /> Evaluation Monitoring Program (EMP)/Corrective Action Program (CAP) wells that were <br /> completed downgradient of the ARU in 2011 were also used in the TVOC mass calculation. <br /> Tables 2 through 5 present a quarterly summary of the VOC groundwater monitoring results <br /> from the monitoring period, including the TVOC concentration for each well. Estimated (trace) <br /> detections of VOCs between the laboratory reporting limit (RL) and method detection limit <br /> (MDL) are also presented on Tables 2 through 5, but such trace detections are not included in <br /> the calculation of TVOC concentrations. Of note, suspected and/or confirmed field/laboratory <br /> contaminants for acetone and methyl ethyl ketone that were not repeated in subsequent <br /> sampling events were also not included in the TVOC calculations. <br /> In an August 19, 2005 letter, the RWQCB specified that future Annual Corrective Action <br /> Evaluation Reports shall include: <br /> • A discussion of the landfill cover, including any performance issues from the previous <br /> year; <br /> A summary and discussion of the previous year's monitoring data from the facility's <br /> landfill gas monitoring system and landfill gas extraction system; <br /> A comparison of the previous year's groundwater monitoring results to computer <br /> simulations originally presented in the August 6, 2001 Revised Engineering Feasibility <br /> Study, and <br /> • A discussion of the overall corrective action progress, including any proposed <br /> enhancements to the program. <br /> The RWQCB later incorporated these requirements and quarterly groundwater potentiometric <br /> maps into Section B.5 of the M&RP. These requirements are addressed in Sections 4, 5, 6, and <br /> 7, respectively, of this report. <br /> 1.0 TVOC MASS <br /> Isoconcentration maps of groundwater TVOC concentrations for the monitoring period are <br /> presented in Figures 1 through 4. Consistent with the Evaluation Procedures Report, these <br /> maps utilize a contour interval of 25 µg/L and do not include contouring for concentrations less <br /> than 1 µg/L. Of note, the isoconcentration maps presented herein included all of the ARU <br /> groundwater monitoring wells including the 18 EMP/CAP wells completed in 2011. For each <br /> quarter,the TVOC mass was estimated using the following procedures: <br /> • The TVOC mass between each pair of isoconcentration contours was first estimated by <br /> multiplying the average TVOC concentration between those contours by the assumed <br /> aquifer thickness and porosity. (For example, the average TVOC concentration between <br /> the 25 pg/L and 50 µg/l- contours would be 37.5 ltg/L.) Consistent with the Evaluation <br /> Procedures Report, the aquifer thickness was assumed to be 40 feet and the aquifer <br /> porosity was assumed to be 0.25. <br /> Project No 5017.1030 1 2017 Corrective Action Evaluation Report-Austin Road Unit 2 <br /> Forward Landfill <br />