My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:46 PM
Creation date
7/3/2020 10:59:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2017
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with these Specifications and the CQA Manual. <br /> G. Protection: <br /> 1. Do not route or allow construction traffic, except as necessary, on top of <br /> clay liner once material has been placed and compacted. <br /> 2. Constructed clay liner shall be maintained to meet the requirements of this <br /> Specification until final completion and acceptance of the Work. This shall <br /> include all measures to prevent erosion. During seasonal or other extended <br /> shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1, <br /> PROTECTION OF EXPOSED SURFACES, of this Section. In addition, <br /> the clay liner shall be protected from any contamination that increases the <br /> hydraulic conductivity. Any contaminated material shall be removed and <br /> replaced at no cost to the OWNER. <br /> 3.10 CONSTRUCTION OF CLAY EARTHFILL <br /> A. General: <br /> 3. Clay Earthfill Material shall be processed to meet the requirements of <br /> Article 2.5 of this Specification. The EARTHWORK CONTRACTOR <br /> shall have the option to determine construction procedures to be used, <br /> subject to the approval and acceptance testing by the QA/QC <br /> CONSULTANT. <br /> 4. The EARTHWORK CONTRACTOR shall process the Clay Earthfill • <br /> Material suitable for the purpose intended. After processing, the Clay <br /> Earthfill Material shall be free from dry clods, roots, organic matter, frozen <br /> material, debris, rocks or stones larger than 1 inch, and other deleterious <br /> material. Clay Earthfill Material shall be thoroughly blended and <br /> compacted to provide a homogeneous material relatively uniform in <br /> gradation and moisture content. <br /> 5. The Clay Earthfill Material shall be as uniform as possible, free of <br /> penetrating cracks, and having interlift boundaries completely blended. The <br /> soil shall be compacted to produce a soil structure having low hydraulic <br /> conductivity. <br /> B. Compaction: <br /> 1. Soil shall be spread evenly over the prepared subgrade with a thickness as <br /> required to achieve a 6-inch compacted lift, with a maximum 8-inch loose <br /> lift. <br /> 2. The minimum final thickness and extent of the Clay Earthfill shall be as <br /> shown on the Construction Drawings. <br /> 3. Moisture conditioning shall be uniform throughout each lift <br /> 4. The Clay Earthfill material shall be compacted in-place to a minimum dry <br /> density of 90 percent relative compaction at a water content of 3 to <br /> 5 percent greater than the optimum water content as measured by ASTM <br /> Forward Landfill WMU FU-17 <br /> 02300 17 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.