My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:46 PM
Creation date
7/3/2020 10:59:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2017
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The leachate generation analysis was performed using the Hydrologic Evaluation of Landfill <br /> Performance(HELP)computer model(Schroeder et al, 1988)(see Design Calculations,Appendix B). <br /> The cross section analyzed by the HELP model corresponds to a condition of maximum anticipated <br /> leachate generation. The maximum leachate generation condition was assumed to occur during <br /> placement of the first 10-foot thick lift of refuse in WMU FU-17. <br /> The rainfall rate for the 1,000-year, 24-hour storm is 4.79 inches/day. The maximum leachate <br /> impingement rate estimated by the HELP model for a maximum drainage length of 300-ft and a <br /> LCRS gravel permeability of 0.1 cm/sec is 0.32 inches per day. The HELP analysis shows that the <br /> designed LCRS will maintain less than one foot of head over the liner. <br /> 5.2.1 Slope LCRS <br /> The LCRS on the 4.5:1 interface liner slopes will consist of a GDN placed directly upon the HDPE <br /> geomembrane. The GDN is comprised of a sheet of geonet drainage material with a nonwoven <br /> geotextile filter fabric bonded to one side. To maintain its position on the slope,the GDN is anchored <br /> at the slope crest. The geonet component of individual panels will be joined with plastic ties, and the <br /> geotextile component will be sewn. Because the placement of the protective operations layer will not <br /> occur immediately after placement of the GDN, a protective plastic covering will be placed over the <br /> GDN to protect the geotextile component from ultraviolet (UV) deterioration. The protective plastic <br /> covering will be progressively removed and replaced with the protective operations layer in <br /> conjunction with refuse placement. <br /> The GDN transmissivity was calculated based on the anticipated leachate generation calculated by the <br /> HELP analysis. The required transmissivity is specified under the imposed loading conditions. The <br /> GDN will tie directly to the base granular drainage layer. <br /> 5.2.2 Base LCRS <br /> The base LCRS will be constructed of a 12-inch-thick layer of clean granular material with a <br /> minimum hydraulic conductivity of 0.1 cm/sec draining towards leachate collection pipe trenches. <br /> The particle size of the granular drainage material has been limited to a maximum of 3/8-inch to <br /> protect against puncture of the underlying geomembrane and the overlying geotextile filter fabric, and <br /> to a maximum of 3 percent of particles finer than the No. 200 sieve to maintain its permeable nature. <br /> The granular drainage material is also specified to consist of rounded sub-angular gravel (i.e., no <br /> crushed rock will be allowed) to protect the underlying geomembrane from puncture or tears. In <br /> addition, a protective geotextile cushion will be placed between the geomembrane and granular <br /> drainage material for added geomembrane puncture resistance. <br /> If the granular drainage material appears more angular than desired by the Engineer and QA/QC <br /> Consultant, the Contractor will be required to demonstrate the suitability of the material by utilizing <br /> an on-site test area. The test will consist of placing a 1-foot thickness of granular drainage material on <br /> a 15-foot by 30-foot piece of 60-mil HDPE geomembrane and cushion geotextile using the same <br /> equipment and procedures as the Contractor is planning to use to place the granular drainage material <br /> in WMU FU-17. The QA/QC Consultant will then inspect and, if necessary, test the 60-mil HDPE <br /> geomembrane for damage and either accept or reject the angularity of the proposed granular drainage <br /> material. <br /> The leachate collection trenches will contain 6-inch diameter SDR 11 perforated HDPE leachate <br /> collection pipes (see pipe sizing and loading calculations in Appendix B). The pipes will be placed <br /> within each leachate collection trench to increase the drainage capacity of the LCRS. Each pipe will <br /> be surrounded by coarse gravel wrapped with a nonwoven geotextile to prevent migration of fine <br /> WMU FU-17 DESIGN REPORT 5-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.