Laserfiche WebLink
SECTION 6 <br /> Summary <br /> This report presents the construction documents and supporting design criteria required for <br /> completion of WMU FU-17 at the Forward Landfill. Design calculations have been performed and <br /> construction documents prepared to demonstrate that the design of this unit complies with Forward's <br /> WDRs,and Title 27 requirements. <br /> These Design and Construction Documents have been prepared under the supervision of Sangeeta P. <br /> Lewis,whose seal as a Registered Professional Engineer in the State of California is affixed below. <br /> ®14s�,QFEaSi �/9 <br /> NO. C47735 "' m <br /> SANGEETA P. LEWIS RCE C47735 Cr- EXP 1 a-3I.2& <br /> T c1n, <br /> ATF OF CAt-NiOW <br /> WMU FU-17 DESIGN REPORT 6-1 <br />