Lewis Engineering,Design and Construction Documents, WMUFU-13,Forward Inc. Landfill,2013.
<br /> Lewis Engineering, Design and Construction Documents, WMU FU-14, Forward Inc. Landfill,2014.
<br /> Lopes, R.F.et al.,"Geosynthetics Interface Friction;A Challenge for Generic Design and
<br /> Specification,"Geosynthetics '93 Conference Conference Proceedings,Vancouver,Canada, 1993.
<br /> Lydick, L.D.,et al.,"Interface Friction of Geonets,"Proceedings of the Fourth GRI Conference,
<br /> December 1990.
<br /> Matosovic, F.I., and Kavazanjian, E.,Cyclic Characterization of Off Landfill Solid Waste,ASCE
<br /> Journal of Geotechnical and Geoenvironmental Engineering, 1998.
<br /> Makdisi and Seed.A Simplified Procedure for Estimating Earthquake Induced Deformation in Dams
<br /> and Embankments,University of California Berkeley,EERC 77/19.August 1977.
<br /> Mitchell,J.K.,et al.,"Kettleman Hills Waste Landfill Slope Failure I: Liner System Properties, ASCE
<br /> Journal of Geotechnical Engineering,April 1990.
<br /> Schroeder,P.R.,Peyton, R.L., McEnroe, B.M.,and Sjostrom,J.W.,The Hydrologic Evaluation of
<br /> Landfill Performance(HELP)Model. User's Guide for Version 2, U.S. Army Engineer Waterways
<br /> Experiment Station,Vicksburg, MS.October 26, 1988.
<br /> Sharma,H. D.,and Lewis, S.P., Waste Containment Systems, Waste Stabilization, and Landfills:
<br /> Design and Evaluation.John Wiley and Sons,New York, 1994.
<br /> Sharma, S.,XSTABL, An Integrated Slope Stability Analysis Program for Personal Computers,
<br /> Version S, Interactive SoBward Designs, Inc.,2003
<br /> Singh, S.Evaluation of the Strength and Stability of Sanitary Landfills, Santa Clara University,July
<br /> 1989.
<br /> Spangler,M.G.,and Handy, R.L.,Soil Engineering, 4`"Edition,Harper Collins, 1982.
<br /> Vector Engineering,Final Construction Quality Assurance Report for WMU D-98 and the WMU D-
<br /> 94 Extension at the Forward, Inc. Landfill,January 1999,(1999a).
<br /> Vector Engineering,Final Construction Quality Assurance Report for WMU D-99, Class II Leachate
<br /> Impoundment, and Closure of the Eastern Ash Pit at the Forward, Inc. Landfill, September 1999
<br /> (1999b).
<br /> Vector Engineering,Final Construction Quality Assurance Report for WMU D-02 at the Forward,
<br /> Inc. Landfill, 2002.
<br /> Vector Engineering,Final Construction Quality Assurance Report for WMUART-03 at the Forward,
<br /> Inc. Landfill, 2003.
<br /> Vector Engineering,Final Construction Quality Assurance Report for WMU FU-03 at the Forward,
<br /> Inc. Landfill,2003.
<br /> Vector Engineering,Final Construction Quality Assurance Report for WMU FU-04 at the Forward,
<br /> Inc. Landfill, 2004.
<br /> 7-3
<br /> WMU FU-17 DESIGN REPORT
<br />
|