Laserfiche WebLink
Project Name FFom Lft i)® ILL. <br /> Inspector's Named N L &H0PN J .4VALUE <br /> — <br /> UnitTested tt1 ENGINEERING <br /> Date_ A ::T �- <br /> ANNUAL LCRS CONTINUITY TEST INSPECTION <br /> (C)TRACER DYE DETECTION MONITORING LOG <br /> Pump start time: ;3 O M 91 17T Approximate pump flow rate: <br /> Does the pump reading indicate continuous flow? Yes_No <br /> Time Flow Rate(gpm) Tracer Dye Detected <br /> 1/3o N 10 <br /> /13 — 1 n <br /> 1aj::�- ti10 � <br /> it Lo '1� 0 <br /> I Nil <br /> ti <br /> Was tracer dye detected from the LCRS sump? Yes No <br /> If Yes, state approximate migration time to detection Z <br /> If No,state possible reason <br /> Remedial Action Work Order Date Completed Signature <br /> Signature of Inspector <br /> Page 2 of 2 <br />