My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:46 PM
Creation date
7/3/2020 10:59:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2017
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASE AND SLOPE LEACHATE COLLECTION AND REMOVAL SYSTEM DESIGN <br /> WMU FU-17 <br /> FORWARD LANDFILL <br /> PROBLEM: <br /> Size the leachate collection and removal system components for the base of WMU FU-17. <br /> GIVEN: <br /> These calculations were previously performed for the WMUs D-95, D-97, D-98,D-99, D-00,D-01, D-02, <br /> FU-03, FU-04, FU-05,FU-06, FU-08,FU-10,FU-13,and FU-14 design. The same methodology for <br /> performing the previous calculations was used for the WMU FU-17 calculations. Previous calculations are <br /> used,referenced,or attached,where applicable. <br /> SUMMARY: <br /> 1. Required permeability of granular drainage material is 0.1 cm/sec. <br /> 2. Required permeability of coarse gravel is 1 cm/sec. <br /> 3. Specify 6-inch diameter,SDR 11 HDPE pipe. <br /> 4. Specify perforation pattern for pipes of 1/2-inch diameter holes drilled at third points every 6-inches <br /> along pipe length. <br /> 5. The temporary sumps are sized assuming the maximum leachate generation time is when there is only <br /> a 10-ft lift of refuse in the cell. <br /> is 6. Site personnel will select the pump size. <br />
The URL can be used to link to this page
Your browser does not support the video tag.