My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:46 PM
Creation date
7/3/2020 10:59:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2017
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�0REPUBLIC <br /> 0� SERVICES <br /> Forward Landfill <br /> Calculated Total Nitrogen Loading-Cannery Waste <br /> Week Total Tons of Total Gallons Average Total Nitrogen Average Total Calculated Total Calculated Total Cumulative <br /> Residuals of Rinsate (as N)in Residuals Nitrogen(as N)in Nitrogen Applied per Nitrogen Applied Total <br /> (mg/Kg) Rinsate(mg/L) Week(pounds) per Acre(pounds) Nitrogen <br /> Applied per <br /> Acre <br /> (pounds) <br /> per week <br /> 18 J une to 24 J une 2017 136.0 0 1310.0 0.0 2.6 0.03 0.03 <br /> 25 June to 01 July 2017 42.5 0 2550.0 0.0 5.1 0.07 0.10 <br /> 02 July to 08 July 2017 34.0 0 6880.0 0.0 13.8 0.18 0.29 <br /> 09 July to 15 July 2017 102.0 0 2690.0 0.0 5.4 0.07 0.36 <br /> 16 July to 22 July 2017 212.5 28,000 1730.0 510.0 122.6 1.64 1.99 <br /> 23 July to 29 July 2017 314.5 68,000 1990.0 750.0 429.6 5.73 7.72 <br /> 30 July to 05 August 2017 416.5 76,000 2950.0 270.0 177.1 2.36 10.08 <br /> 06 August to 12 August 2017 365.5 104,000 4235.0 290.0 260.2 3.47 13.55 <br /> 13 August to 19 August 2017 552.5 112,000 1530.0 330.0 311.5 4.15 17.71 <br /> 20 August to 26 August 2017 442.0 116,000 1945.0 190.0 187.8 2.50 20.21 <br /> 27 August to 02 September 2017 357.0 136,000 2430.0 320.0 368.1 4.91 25.12 <br /> 03 September to 09 September 2017 221.0 76,000 1670.0 570.0 364.9 4.86 29.98 <br /> 10 September to 16 September 2017 161.5 84,000 2420.0 520.0 369.4 4.92 34.91 <br /> 17 September to 23 September 2017 68.0 76,000 2800.0 490.0 316.4 4.22 39.13 <br /> 24 September to 30 September 2017 42.5 76,000 2240.0 190.0 125.0 1.67 40.79 <br /> 01 October to 07 October 2017 0.0 40,000 0.0 770.0 257.0 3.43 44.22 <br /> 08 October to 14 October 2017 0.0 8,000 0.0 886.0 59.2 0.79 45.00 <br /> Season Total 3,460 tons 1,000,000 gal 45.0 pounds <br /> .Notes.- <br /> Cannery <br /> otes:Cannery mud received during the 2017 season was not land-applied, mud was placed on drying bed on landfill, dried, and then used for alternative daily cover and <br /> not included in the loading calculations and not included in this table. <br />
The URL can be used to link to this page
Your browser does not support the video tag.