Laserfiche WebLink
Table 1 • • <br /> Proposed Monitoring Well Construction Details <br /> OAPADIS <br /> Forward Landfill,Manteca,California <br /> DepthMinimum Anticipated Casing <br /> Proposed Borehole Borehole <br /> Extraction Elevation Depth Diameter <br /> Well Latitude Longitude (ft amsi) (ft bgs) (inches) (ft bloc) (ft bgs) (inches) (ft) (inches) Placementl Seal Surface Completion <br /> #3 CEMEX Lapis 5 ft 3/8 Concrete at surface with <br /> 8 inch sch. 0.020 or 0.030 Lustre or 8/16 hydrated minimum 4-foot apron and j- <br /> EW-5 37°53'0.30"N 121'1 1'53.58"W 39 115-125 12 50-55 110-120 80 polyvinyl 30 wire-wrapped silica sand filled to plug on production casing, <br /> chloride stainless >5 feet from top of bentonite chips configured to enable hookup to <br /> screen extraction system <br /> Notes: <br /> ft-feet <br /> amsl-above mean sea level <br /> bgs-below ground surface <br /> '-Exact slot size and filter pack to be confirmed based on grain size analysis of samples collected from the screen interval during pilot hole advancement <br /> PVC-Polyvinyl chloride <br /> FL Well Construction 2019 EW-Revised.xlsx <br /> 7/3/2019 <br />