Laserfiche WebLink
Forward Landfill #39-AA-0015) <br /> Quart ing <br /> Types/Quant' ate Per Day <br /> Third Quarter -Sept 2011) <br /> TOTAL TOTAL TOTALTONS <br /> FRIABLE NON-FRIABLE TREATED C&D TONS ADC ADC BENEFICIAL SOIL CANNERY CANNERY R 8 R R 8 R TONS TRUCK RECEIVED <br /> DATE ASBESTOS ASBESTOS TRASH SLUDGE CII MISC ASH WOOD WASTE CII SOIL STKPL LANDFILLED TASW GREENWASTE REUSE-INERTS MATERIAL MUD TOMATO RECY. GREENWASTE RECEIVED COUNT LESS SOIL <br /> 1-Au -11 43.54 0 2834.8 7.55 207.09 14.81 5.55 118.34 26.09 0 3257.77 328.41 0 29.11 157.96 0 20 8.18 121.37 3922.80 278 3764.84 <br /> 2-Au -11 11.89 2.57 2647.71 24.11 213.12 0 37.17 84.3 26.65 0 3047.52 524.07 0 64.28 165.28 0 50 10.06 139.53 4000.74 275 3835.46 <br /> 3-Aug-1 1 19.30 3.73 2351.74 8.82 183.72 0.00 18.36 193.65 195.57 0 2974.89 315.04 0 30.6 278.16 30.34 80 6.63 160.33 3875.99 279 3597.83 <br /> 4-Au -11 41.86 0.00 2325.00 29.94 231.85 0.00 27.37 207.26 17.05 0 2880.33 59.8 0 39.1 390.29 0 30 9.15 236.93 3645.60 250 3255.31 <br /> 5-Aug-1 1 134.13 13.50 2837.43 41.43 1212.22 0.00 60.10 5.37 0.00 0 4304.18 433.46 0 22.35 358.39 30.62 10 8.77 187.19 5354.96 361 4996.57 <br /> 6-Au -11 61.54 0.00 583.27 0.00 24.80 0.00 0.00 0.00 0.00 0 669.61 97.46 0.00 22.74 0.00 9.90 20.00 0.00 0.00 819.71 48 819.71 <br /> 7-Au -11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0 0 0 70 40 0 0.00 110.00 11 110.00 <br /> 8-Aug-1 1 152.47 0.00 2628.38 4.98 485.33 156.50 14.14 226.49 15.64 0 3683.93 383.41 0 0 620.38 9.34 20 48.73 145.44 4911.23 329 4290.85 <br /> 9-Au -11 58.80 8.25 2573.30 26.76 231.66 85.17 8.28 212.84 0.00 0 3205.06 298.27 0 22.13 734.36 33.92 20 49.58 165.12 4528.44 302 3794.08 <br /> 10-Au -11 0.00 0.00 2705.46 10.86 508.12 79.15 12.14 178.37 74.55 0 3568.65 372.19 0 83.14 773.57 42.18 40 47.22 147.11 5074.06 330 4300.49 <br /> 11-Au -11 40.97 39.93 2578.86 23.97 266.16 62.17 7.52 186.34 77.97 0 3283.89 371.2 0 16.56 846.61 20.64 50 48.12 146.50 4783.52 322 3936.91 <br /> 12-Au -11 59.72 19.26 3004.38 36.26 202.08 82.20 0.00 176.19 72.48 0 3652.57 432.5 0 73.02 467.98 61.16 80 49.13 232.20 5048.56 350 4580.58 <br /> 13-Au -11 42.59 0.00 575.67 0.00 30.77 0.00 3.60 0.00 57.18 0 709.81 79.61 0.00 0.00 0.00 18.22 10.00 0.00 0.00 817.64 57 817.64 <br /> 14-Aug-1 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0 0 0 50 40 0 0.00 90.00 9 90.00 <br /> 15-Aug-1 1 0.00 0.00 2672.15 67.57 276.66 21.32 0.00 230.85 4.28 0 3272.83 312.49 0 0 441.05 9.54 50 8.81 155.67 4250.39 280 3809.34 <br /> 16-Au -11 3.08 24.35 1 2495.07 37.12 1 280.09 62.11 29.26 1 177.16 32.32 0 3140.56 410.72 0 23.22 503.06 19.24 40 9.76 110.03 4256.59 289 3753.53 <br /> 17-Aug-11 21.74 3.19 2628.93 63.86 277.08 104.23 16.98 51.22 0.00 0 3167.23 471.91 0 0 966.43 18.88 80 5.4 107.45 4817.30 309 3850.87 <br /> 18-Au -11 0.00 0.00 2543.00 130.82 309.37 41.28 28.41 29.23 0.00 0 3082.11 587.59 0 17.24 417.2 22.63 30 8.28 112.96 4278.23 299 3861.03 <br /> 19-Au -11 11.71 38.34 2448.51 162.23 300.35 39.48 24.39 80.28 24.52 0 3129.81 259.47 0 11.37 236.73 33.25 40 8.21 174.08 3892.92 286 3656.19 <br /> 20-Au -11 3.81 1.44 419.98 0.00 177.88 161.93 0.00 0.00 0.00 0 765.04 210.08 0.00 0.00 0.00 19.39 0.00 0.00 0.00 994.51 64 994.51 <br /> 21-Au -11 1 0.00 0.00 1 0.00 0.00 1 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0 0 0 50 80 0 0.00 130.00 13 130.00 <br /> 22-Au -11 8.61 0.00 2638.09 19.38 277.91 42.01 14.28 9.64 0.00 0 3009.92 218.89 0 9.49 436.52 32.59 20 50.84 106.97 3885.22 283 3448.70 <br /> 23-Au -11 66.00 2.83 2454.03 20.67 669.96 148.19 10.19 150.92 15.07 0 3537.86 507.24 0 39.92 364.89 44.05 70 46.62 98.17 4708.75 306 4343.86 <br /> 24-Au -11 0.00 0.00 2453.02 39.78 375.02 191.36 0.00 105.51 8.54 0 3173.23 406.13 0 20.06 1631.03 21.72 30 44 89.69 5415.86 337 3784.83 <br /> 25-Au -11 15.65 13.23 2409.11 25.30 298.15 196.06 5.30 4.90 0.00 0 2967.70 459.68 0 12.86 390.28 29.61 50 48.55 116.48 4075.16 301 3684.88 <br /> 26-Au -11 1 0.00 2.12 1 2635.50 0.00 266.19 63.89 18.22 77.82 1096.02 0 4159.76 431.85 0 5.21 167.61 0 50 49.89 194.66 5058.98 349 4891.37 <br /> 27-Aug-1 1 0.00 0.00 673.72 0.00 22.58 21.65 1.20 20.60 0.00 0 739.75 57.66 0.00 0.00 0.00 8.72 30.00 0.00 0.00 836.13 53 836.13 <br /> 28-Au -11 0.00 0.00 0.00 0.00 0.00 0.00 1 0.00 0.00 0.00 0 0.00 0 0 0 0 40 100 0 0.00 140.00 14 140.00 <br /> 29-Au -11 3.03 0.00 2517.20 4.46 248.43 64.51 5.43 230.82 1319.98 0 4393.86 240.6 0 21.79 472.99 32.03 30 7.68 92.11 5291.06 327 4818.07 <br /> 30-Au -11 24.40 5.48 2541.65 0.00 293.11 83.69 8.11 260.79 325.04 0 3542.27 430.47 0 0 424.89 32.24 40 11.36 114.14 4595.37 307 4170.48 <br /> 31-Aug-11 5.63 0.00 2525.48 27.50 291.75 63.71 7.05 114.38 26.22 0 3061.72 528.46 0 12.12 266.21 20.59 30 4.2 46.60 3969.90 269 3703.68 <br /> 0.00 0.00 0 <br /> 0.00 0.00 <br /> �TOTALS0.47 178.22 61701.44 813.37 8161.45 1785.42 363.05 3133.27 1 3415.17 0.00 80381.86 9228.66 0 1 576.31 11511.87 811 1280 589.17 3200.75 107579.62 <br /> A total of 0 tons of Stockpiled Material was cleared for cover soil. <br />