Laserfiche WebLink
■ <br /> EST PIT LOGS <br /> PROJECT NUMBER 939-{}1.03 PACE 1 OF 1 <br /> PROJECT NAME Harney Lane Sanitary Landfill DATE LOGGED 3-27-87 <br /> Gas Monitoring Probe Installation <br /> LOGGED BY APK RIC Ma giora B-53 PIT WIDTH „ <br /> 6 au er <br /> PIT NO. DEPTH IN FEET SOIL TYPE DESCRIPTION SAMPLE SAMPLE <br /> DEPTH <br /> Start: 14:20 <br /> P-7B 0 - S Clayey, sandy silt, damp <br /> 5 - 10 Sandy silt w/some siltstone chips <br /> dry <br /> 10 - 15 Very clayey, silty sand, brown, damp <br /> 15 - 20 Sandy silt, tan <br /> 20 - 25 Clay, w/traces of sand, brown <br /> 25 - 30 Silty clay, brown, moist <br /> 30 - 35 Clayey silt w/some siltstone chips. <br /> Tannish brown, moist <br /> 35 - 40 Clayey silt, grayish brown <br /> Completed depth 33' <br /> End: 15:00 <br /> REMARKS: <br /> >EAICOA <br /> .aaoc . aa <br /> PLATE 8 <br />