Laserfiche WebLink
s <br /> TEST PIT LOGS <br /> PROJECT NUMBER 939-01.03 PAGE 1 OF 1 <br /> PROJECT NAME Harney Lane Sanitary Landfill DATE LOGGED 3/28/87 <br /> Gas Monitoring Pr Installation <br /> LOGGED BY APw � � Ma i ora B-53 PIT WIDTH 6"au er <br /> PIT NO. DEPTH IN FEET SOIL TYPE DESCRIPTION SAMPLE SAMPLE <br /> DEPTH <br /> P-10 Start: 10:35 <br /> 0 - 5 Sandy silt, tan <br /> 5 - 10 Clayey, sandy silt, tan <br /> 10 - 15 Clayey, sandy silt, tan <br /> 15 - 20 Clayey silt, few sands, brown <br /> 20 - 25 Sandy silt, sand fine to medium <br /> 25 - 30 Silty sand, fine to medium <br /> 30 - 35 Silty sand, medium w/sparse <br /> gravel <br /> 35 - 40 Silty, Clayey sand, w/sparse <br /> gravel <br /> (Hardpan possibly beginning at 39' ) <br /> Completed depth: 32.5' <br /> End: 12:00 <br /> REMARKS: <br /> Located 30' west of eastern fence line between road and "Y" ditch <br /> U0 <br /> ' €nitOA <br /> •ssoc +res <br /> PLATE 11 <br />