My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1989_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1989_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:52:44 PM
Creation date
7/3/2020 11:01:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1989_1
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_1989_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.1 BASE LINER AND LEACHATE CONTROL FACILITIES <br />' The North County Sanitary Landfill has been sited to meet the requirements of <br />Section 2533(b)(1) of Subchapter 15; thus, placing a single clay liner with perme- <br />ability of 1 x 10-6 cm/sec or less is not required. However, a liner has been <br />planned for the site, which necessitates that the site also have a leachate collec- <br />tion and removal system (LCRS) pursuant to Section 2543(a) of Subchapter 15. <br />The LCRS will consist of <br />• a 1 -foot -thick clay liner with a permeability of 1 x 10-6 cm/sec or <br />less <br />- a dendritive network composed of 6 -inch -diameter perforated pipes <br />installed in granular drainage material <br />- a 10 -ounce per square yard geotextile surrounding the granular <br />drainage material <br />• a 1 -foot -thick operations layer over the clay liner and dendritive <br />network <br />' 10.1.1 Clay Liner <br />' Preconstruction laboratory testing, combined with nuclear density field testing <br />during compaction, will provide quality control for base liner construction. <br />' Before constructing the clay liner the following tests will be performed on pro- <br />posed clay liner soil unless applicable test results from previous construction pre- <br />clude new testing. <br />' • Compaction curve - one representative sample of material <br />Moisture content - one representative sample of material <br />' • Sieve analysis - one representative sample of material <br />Hydraulic Conductivity (permeability) - representative samples of <br />material, compacted to a relative compaction of 90 percent of the <br />maximum dry density at selected moisture contents. The number <br />of samples tested and the moisture contents will be determined <br />before testing, depending on the characteristics of the soil to be <br />tested. <br />PJ9 9390219A.00W 46 Rev. 0 July 19 1989 <br />
The URL can be used to link to this page
Your browser does not support the video tag.