My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 11:01:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Unit Requirements for N-1119-1 1 icontinued) Page 3 of 4 <br /> 16. This operating permit may be cancelled with APCO approval when the landfill is closed,pursuant to the requirements <br /> of this permit,if the landfill is not otherwise subject to the requirements of either 40 CFR part 70 or part 71 and if <br /> 0 either 1) it was never subject to the requirement for a control system under 40 CFR 60.752(b)(2); or 2)the owner or <br /> operator meets the conditions for control system removal specified in 40 CFR 60.752(b)(2)(v). [40 CFR 60.752(d)and <br /> 62.14352(f)]Federally Enforceable Through Title V Permit <br /> 17. If the landfill is permanently closed,a closure notification shall be submitted to the APCO within 30 days of waste <br /> disposal cessation. A permanent closure must take place in accordance with 40 CFR 258.60. If a closure report has <br /> been submitted;no additional waste may be placed in the landfill without filing a notification of modification to the <br /> APCO,pursuant to 40 CFR 60.7(a)(4). [40 CFR 60.752(b)(1)(ii)(B), 60.757(d)and 62.14352(f)] Federally Enforceable <br /> Through Title V Permit <br /> 18. If the calculated NMOC is equal to or greater than 50 megagrams/year,the owner or operator shall install a collection <br /> and control system,that effectively captures the gas generated within the landfill,within 30 months of that <br /> determination. This operating permit must be modified accordingly to show compliance with 40 CFR 62,Subpart <br /> GGG requirements applicable to a MSWL with a collection and control system. [40 CFR 60.752(b)(2)(ii), 60.753, <br /> 60.755, 60.756, 62.14353 and 62.14354] Federally Enforceable Through Title V Permit <br /> 19. If a gas collection and control system is installed, it shall comply with the operational standards of 40 CFR 60.753,the <br /> compliance provisions of 40 CFR 60.755,the monitoring provisions of 40 CFR 60.756, the reporting and record <br /> keeping requirements of 40 CFR 60.757 and 60.758,and the requirements of 40 CFR 60.759.(for active collection <br /> systems). [40 CFR 60.752(b)(2)(ii), 60.753, 60.755, 60.756, 60.757, 60.758, 60.759, 62.14353 and 62.14354(b)] <br /> Federally Enforceable Through Title V Permit <br /> 20. Permittee shall comply with the Increments of Progress as defined in Table 3 of 40 CFR 62, Subpart GGG,unless a <br /> site specific schedule is approved by EPA,which includes notification of EPA no later than 10 business days after <br /> completing each increment of progress. [40 CFR 62.14355(b)] Federally Enforceable Through Title V Permit <br /> Permittee shall submit the Final Control Plan(as defined in 40 CFR 62.14351) one year after the first annual emission <br /> rate report showing NMOC emissions>50 megagrams/year,unless a site-specific schedule is approved by EPA. <br /> (Increment 1) [40 CFR 62.14356(a)(1)] Federally Enforceable Through Title V Permit <br /> 22. Permittee shall Award Contract(s) (as defined in 40 CFR 62.14351) on or before December 6, 2001, or 20 months after <br /> the first annual emission rate report showing NMOC emissions>50 megagrams/year,unless a site-specific schedule is <br /> approved by EPA. (Increment 2) [40 CFR 62.14356(x)(2)]Federally Enforceable Through Title V Permit <br /> 23. Permittee shall Initiate On-Site Construction(as defined in 40 CFR 62.14351) on or before April 6, 2002,or 24 months <br /> after the first annual emission rate report showing NMOC emissions>50 megagrams/year, unless a site-specific <br /> schedule is approved by EPA. (Increment 3) [40 CFR 62.14356(x)(3)] Federally Enforceable Through Title V Permit <br /> 24. Permittee shall Complete On-Site Construction(as defined in 40 CFR 62.14351)on or before October 6,2002,or 30 <br /> months after the first annual emission rate report showing NMOC emissions+>50 megagrams/year,unless a site- <br /> specific schedule is approved by EPA. (Increment 4) [40 CFR 62.14356(a)(4)] Federally Enforceable Through Title V <br /> Permit <br /> 25. Permittee shall Achieve Final Compliance (as defined in 40 CFR 62.14351) on or before October 6, 2002, or 30 <br /> months after the first annual emission rate report showing NMOC emissions>50 megagrams/year,unless a site- <br /> specific schedule is approved by EPA. (Increment 5) [40 CFR 62.14356(x)(5)] Federally Enforceable Through Title V <br /> Permit <br /> 26. Permittee must conduct initial performance tests of the landfill gas collection system and air pollution control <br /> equipment on or before April 4,2003, or 30 months and 180 days after the first annual emission rate report showing <br /> NMOC emissions>50 megagrams/year,unless a site-specific schedule is approved by EPA. [40 CFR 62.14356(x)(5)] <br /> Federally Enforceable Through Title V Permit <br /> All equipment or systems installed or used to achieve compliance with the terms and conditions of this Permit to <br /> Operate shall be maintained in good working order and be operated as efficiently as possible to minimize air pollution <br /> emissions. [District NSR Rule] Federally Enforceable Through Title V Permit <br /> PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br /> These terms and conditions are part of the Facility-wide Permit to Operate. <br /> Facility Name: NORTH COUNTY SANITARY LANDFILL <br /> Location: 17916 E.HARNEY LANE,LODI,CA 95240 <br /> N-1119.1-1:May 27 2002 4t45PM-SHAFFERD <br />
The URL can be used to link to this page
Your browser does not support the video tag.