Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2002-0219 -23- <br /> FOR COUNTY OF SAN JOAQUIN <br /> FOR CONSTRUCTION AND OPERATION OF NORTH COUNTY RECYCLING <br /> CENTER AND SANITARY LANDFILL FACILITY, <br /> SAN JOAQUIN COUNTY <br /> 3. A transmittal letter explaining the essential points shall accompany each report. At a <br /> minimum,the transmittal letter shall identify any violations found since the last report <br /> was submitted, and if the violations were corrected. If no violations have occurred since <br /> the last submittal,this shall be stated in the transmittal letter. The transmittal letter shall <br /> also state that a discussion of any violations found since the last report was submitted, <br /> and a description of the actions taken or planned for correcting those violations, <br /> including any references to previously submitted time schedules, is contained in the <br /> accompanying report. <br /> 4. Each monitoring report shall include a compliance evaluation summary. The summary <br /> shall contain at least: <br /> a. For each monitoring point and background monitoring point addressed by the <br /> report, a description of: <br /> 1) The time of water level measurement; <br /> 2) The type of pump -or other device-used for purging and the elevation of the <br /> pump intake relative to the elevation of the screened interval; <br /> 3) The method of purging(the pumping rate; the equipment and methods used to <br /> monitor field pH, temperature, and conductivity during purging; the calibration <br /> of the field equipment; results of the pH, temperature, conductivity, and <br /> turbidity testing; and the method of disposing of the purge water) to remove all <br /> portions of the water that was in the well bore while the sample was being <br /> taken; <br /> 4) The type of pump -or other device-used for sampling,if different than the <br /> pump or device used for purging; and <br /> 5) A statement that the sampling procedure was conducted in accordance with the <br /> approved Sampling and Analysis Plan. <br /> b. A map or aerial photograph showing the locations of observation stations, <br /> monitoring points, and background monitoring points. <br /> c. For each groundwater body, a description and graphical presentation of the gradient <br /> and direction of groundwater flow under/around the Unit, and the groundwater flow <br /> rate,based upon water level elevations taken prior to the collection of the water <br /> quality data submitted in the report. <br /> d. Laboratory statements of results of all analyses evaluating compliance with <br /> requirements. <br />