My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 11:01:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Notes Regarding. Funding. Requirements and Financial Assurances for. <br /> Closure,. Post-Closure Maintenance,. and. Corrective Action <br /> San.Joaquin. County-Owned Landfills <br /> All Sites. <br /> General <br /> Calculation of present-day estimated cost is based on the initial estimated cost and the inflation <br /> factors of years.since the initial estimate(Tables 3). <br /> Title 27,Section 20380(b)-Known or Reasonably Foreseeable.Release <br /> Title.27,Section 22222- Corrective Action Funding Requirements. <br /> Potential corrective action costs (Table 1).due to a"reasonably foreseeable release"were initially, <br /> calculated in the Title 23, Chapter 1 S, Article S,.Financial Assurance Report(San Joaquin <br /> County,December 1991). These costs were based on the assumption that the method of cleanup, <br /> would be to pump and treat the contaminated water using extraction wells and a treatment system <br /> above.ground surface..Corrective.action costs have been updated to.reflect annual inflation <br /> factors(Table.2).. <br /> 'The.County's self.,insurance.plan will cover,these corrective action measure.costs.. <br /> At Poothill Landfill_additional or alternate corrective,action measures,such as landfilZl.gas:, <br /> .extraction,would be funded through Certificates of Participation,issued in 2003. <br /> At the North County Landfill.,additional or alternate corrective action measures,such as soil gas <br /> extraction,would be funded through Certificates of Participation,issued in 2003. <br /> Foothill Sanitary Landfill <br /> Title 27, Section 22207- Closure Funding Requirements <br /> Initial closure cost estimates are presented in the Foothill Sanitary Landfill, Preliminary.Closure <br /> and Postclosure Maintenance Plan (San Joaquin County,January 1994). Cost estimates were <br /> calculated using the Certification Guidelines for Initial Cost Estimates and Alternative Financial <br /> Mechanisms.for Solid Waste Landfills (CIWMB,August 1988). <br /> Closure cost estimates (Table 1) are based on the closure of Module "I" and 20 acres of Module 1 <br /> (approximately 100 acres.total). Revision of the closure cost estimate is.anticipated for 2005. <br /> Funding Requirements Notes San Joaquin County <br /> Revised:5/25/04 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.