Laserfiche WebLink
SECTION 11549 <br /> FLARE STATION CONSTRUCTION <br /> PART 1 GENERAL <br /> 1.01 SUMMARY <br /> A. The Contractor shall furnish all labor, equipment, materials, and <br /> incidentals necessary for the complete and operable flare station as shown <br /> in the drawings and specified herein. <br /> B. The flare station shall be provided complete and operable in accordance <br /> with the following sections: <br /> 11550 Flare Station Enclosed Ground Flare <br /> 11551 Flare Station Landfill Gas Blower <br /> 11552 Flare Station Piping <br /> 11553 Flare Station Blower Skid Assembly <br /> 11554 Flare Station Valves <br /> 1 11549 Flare Station Pipe Supports <br /> 16005 Flare Station Electrical <br /> 16020 Flare Station Control Logic <br /> Equipment Specification Data Sheets <br /> C. Submittals shall be in accordance with the pertinent provisions of Section <br /> 01300. <br /> PART 2 PRODUCTS <br /> A. Product specifications are provided in specification and data sheets <br /> specified in Part 1 and other specification that are incidental to the <br /> construction. <br /> PART 3 EXECUTION <br /> A. Flare Station Construction and testing is specified in specifications and <br /> data sheets specified in Part 1 and other specifications that are incidental to <br /> the drawings. <br /> North County LFG Collection System I FLARE STATION CONSTRUCTION <br /> San Joaquin County Public Works Section 11549 <br />